Skip to main content
MyTapWater.us

PWSID NC0416028

BOGUE BANKS WATER CORPORATION

Community water system serving EMERALD ISLE, NC

See also: all utilities in Emerald Isle · utilities by ZIP 28594

Population served
4,995
Source
Groundwater
Status
Active

Current water quality

Caution: a recent measurement is approaching a regulatory limit

Lead measured at 0.004 mg/L in the most recent sample (caution).

Risk classification follows EPA published MCL / MCLG / HAL values with caution and concern bands reviewed by a clinician. Past resolved violations do not influence this badge. See methodology.

Lead service line inventory

No inventory data on file

We do not yet have this utility's published Lead Service Line Inventory on file. The EPA Lead and Copper Rule Improvements (LCRI) required every community water system to publish one by October 16, 2024 and to identify and replace any lead lines within 10 years. How lead enters drinking water.

Phase 1 coverage focuses on the largest NC utilities. Smaller systems will be added; in the meantime, ask your utility for their inventory or check their Consumer Confidence Report.

Lead and Copper Rule sample data

The most recent measurement per contaminant from EPA's Lead and Copper Rule (LCR) sample table. This is the only per-system sample data EPA publishes in the bulk SDWIS download; values for other regulated contaminants (TTHMs, nitrate, arsenic, etc.) are tracked on this page only when they trigger a violation.

Most recent measurements per contaminant (Lead and Copper Rule) . Sorted by risk: concern first, then caution, then unrated, then safe.
Contaminant Most recent Date Risk
PB90
0.004 mg/L December 31, 2025 Caution

Lead has no safe level (MCLG=0). LCR action level is 0.015 mg/L for the 90th-percentile sample; the LCRI (Oct 2024) lowers the action level to 0.010 mg/L effective Nov 2027. Caution at any detection above LOD; concern anchored to the future LCRI value (0.010 mg/L) for forward consistency. Learn more about Lead. Source.

PFAS and emerging contaminants (UCMR 5)

EPA's fifth Unregulated Contaminant Monitoring Rule cycle (2023; 2025) tested every public water system serving over 3,300 people for 29 per- and polyfluoroalkyl substances (PFAS) and lithium. This system was tested 360 times across UCMR 5; 1 of those substances were detected in at least one sample. Most-recent detection per contaminant shown below.

Most recent UCMR 5 detection per contaminant . Sorted by risk: concern first, then caution, then unrated, then safe.
Contaminant Most recent detection Date Risk
0.017 mg/LJanuary 23, 2024 Below regulatory thresholds

HAL only; not enforceable. UCMR-monitored. Learn more about lithium. Source.

Tested but not detected (29 contaminants)

EPA tested for these substances and every sample was below the minimum reporting level. Absence of detection does not mean true zero; it means below the laboratory's quantitation threshold.

Compliance history

EPA-recorded violations against this system over the last 5 years. Health-based violations are when a measured limit was exceeded; monitoring and reporting items are paperwork issues (missed sample dates, late filings) that do not themselves indicate unsafe water.

No health-based violations

No health-based violations on file in the last 5 years. EPA recorded 20 monitoring or reporting items (paperwork) during the same period.

20 monitoring and reporting item s (paperwork) · these are not health risks
Monitoring and reporting items in the last 5 years
Period start Relates to Item Status
September 11, 2025 Revised Total Coliform Rule Report Sample Result/Fail Monitor (RTCR) Resolved
July 1, 2025 Revised Total Coliform Rule Report Sample Result/Fail Monitor (RTCR) Resolved
January 1, 2025 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
January 1, 2025 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
January 1, 2025 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
January 1, 2025 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
January 1, 2025 Tthm Monitoring and Reporting (DBP) Resolved
January 1, 2025 Tthm Monitoring and Reporting (DBP) Resolved
January 1, 2025 Tthm Monitoring and Reporting (DBP) Resolved
January 1, 2025 Tthm Monitoring and Reporting (DBP) Resolved
January 1, 2025 Tthm Monitoring and Reporting (DBP) Resolved
October 1, 2024 Tthm Monitoring and Reporting (DBP) Resolved
October 1, 2024 Tthm Monitoring and Reporting (DBP) Resolved
October 1, 2024 Tthm Monitoring and Reporting (DBP) Resolved
October 1, 2024 Tthm Monitoring and Reporting (DBP) Resolved
October 1, 2024 Tthm Monitoring and Reporting (DBP) Resolved
October 1, 2024 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
October 1, 2024 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
October 1, 2024 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
October 1, 2024 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
146 older violation s (more than 5 years ago)
Violations older than 5 years (146 total)
Period start Relates to Item Status
April 1, 2020 Tthm Maximum Contaminant Level Violation, Average Resolved
April 1, 2020 Tthm Maximum Contaminant Level Violation, Average Resolved
April 1, 2020 Tthm Maximum Contaminant Level Violation, Average Resolved
April 1, 2020 Tthm Maximum Contaminant Level Violation, Average Resolved
April 1, 2020 Tthm Maximum Contaminant Level Violation, Average Resolved
August 1, 2018 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
August 1, 2018 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
August 1, 2018 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
August 1, 2018 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
August 1, 2018 Tthm Monitoring and Reporting (DBP) Resolved
August 1, 2018 Tthm Monitoring and Reporting (DBP) Resolved
August 1, 2018 Tthm Monitoring and Reporting (DBP) Resolved
August 1, 2018 Tthm Monitoring and Reporting (DBP) Resolved
August 1, 2018 Tthm Monitoring and Reporting (DBP) Resolved
January 1, 2015 Hexachlorocyclopentadiene Monitoring, Regular Resolved
January 1, 2015 Hexachlorocyclopentadiene Monitoring, Regular Resolved
January 1, 2015 Hexachlorocyclopentadiene Monitoring, Regular Resolved
January 1, 2015 Hexachlorocyclopentadiene Monitoring, Regular Resolved
January 1, 2015 Hexachlorocyclopentadiene Monitoring, Regular Resolved
January 1, 2015 Hexachlorocyclopentadiene Monitoring, Regular Resolved
March 1, 2011 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
March 1, 2011 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
March 1, 2011 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
March 1, 2011 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
March 1, 2011 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
January 1, 2011 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2011 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2011 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2011 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2011 Chlorine Monitoring and Reporting (DBP) Resolved
July 2, 2010 Stage 2 Disinfectants and Disinfection Byproducts Rule Failure Submit IDSE/Subpart V Plan Rpt Resolved
May 15, 2010 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 31, 2010 Lead and Copper Rule OCCT/SOWT Study/Recommendation Resolved
March 31, 2010 Lead and Copper Rule OCCT/SOWT Study/Recommendation Resolved
March 31, 2010 Lead and Copper Rule OCCT/SOWT Study/Recommendation Resolved
March 31, 2010 Lead and Copper Rule Initial, Follow-up, or Routine Source Water M/R Resolved
March 31, 2010 Lead and Copper Rule Initial, Follow-up, or Routine Source Water M/R Resolved
March 31, 2010 Lead and Copper Rule Initial, Follow-up, or Routine Source Water M/R Resolved
January 1, 2010 Total Haloacetic Acids (Haa5) Monitoring, Routine (IDSE) Resolved
January 1, 2010 Tthm Monitoring, Routine (IDSE) Resolved
October 1, 2009 Lead and Copper Rule Water Quality Parameter M/R Resolved
October 1, 2009 Lead and Copper Rule Water Quality Parameter M/R Resolved
October 1, 2009 Lead and Copper Rule Water Quality Parameter M/R Resolved
October 1, 2009 Lead and Copper Rule Water Quality Parameter M/R Resolved
October 1, 2009 Tthm Monitoring, Routine (IDSE) Resolved
October 1, 2009 Total Haloacetic Acids (Haa5) Monitoring, Routine (IDSE) Resolved
July 1, 2009 Total Haloacetic Acids (Haa5) Monitoring, Routine (IDSE) Resolved
July 1, 2009 Tthm Monitoring, Routine (IDSE) Resolved
April 1, 2009 Tthm Monitoring, Routine (IDSE) Resolved
April 1, 2009 Total Haloacetic Acids (Haa5) Monitoring, Routine (IDSE) Resolved
January 19, 2009 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 1, 2008 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
December 1, 2008 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
December 1, 2008 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
December 1, 2008 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
April 2, 2008 Stage 2 Disinfectants and Disinfection Byproducts Rule Monitoring, Routine (IDSE) Resolved
January 19, 2008 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 19, 2008 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 23, 2007 Public Notice Public Notification Violation for NPDWR Violation Resolved
May 1, 2007 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
May 1, 2007 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
May 1, 2007 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
May 1, 2007 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
May 1, 2007 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
October 1, 2006 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2006 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2006 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
March 1, 2005 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
March 1, 2005 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
March 1, 2005 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
March 1, 2005 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
March 1, 2005 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
July 1, 2004 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
July 1, 2004 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
July 1, 2004 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
July 1, 2004 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
February 1, 1998 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
February 1, 1998 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
February 1, 1998 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
June 1, 1993 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
June 1, 1993 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
June 1, 1993 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
June 1, 1993 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
June 1, 1993 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
June 1, 1993 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
June 1, 1993 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
January 1, 1992 Thallium, Total Monitoring, Regular Resolved
January 1, 1992 Thallium, Total Monitoring, Regular Resolved
January 1, 1992 Thallium, Total Monitoring, Regular Resolved
January 1, 1992 Antimony, Total Monitoring, Regular Resolved
January 1, 1992 Antimony, Total Monitoring, Regular Resolved
January 1, 1992 Selenium Monitoring, Regular Resolved
January 1, 1992 Selenium Monitoring, Regular Resolved
January 1, 1992 Selenium Monitoring, Regular Resolved
January 1, 1992 Fluoride Monitoring, Regular Resolved
January 1, 1992 Fluoride Monitoring, Regular Resolved
January 1, 1992 Fluoride Monitoring, Regular Resolved
January 1, 1992 Antimony, Total Monitoring, Regular Resolved
January 1, 1992 Arsenic Monitoring, Regular Resolved
January 1, 1992 Arsenic Monitoring, Regular Resolved
January 1, 1992 Arsenic Monitoring, Regular Resolved
January 1, 1992 Barium Monitoring, Regular Resolved
January 1, 1992 Barium Monitoring, Regular Resolved
January 1, 1992 Barium Monitoring, Regular Resolved
January 1, 1992 Cyanide Monitoring, Regular Resolved
January 1, 1992 Cyanide Monitoring, Regular Resolved
January 1, 1992 Cyanide Monitoring, Regular Resolved
January 1, 1992 Arsenic Monitoring, Regular Resolved
January 1, 1992 Barium Monitoring, Regular Resolved
January 1, 1992 Cyanide Monitoring, Regular Resolved
January 1, 1992 Thallium, Total Monitoring, Regular Resolved
January 1, 1992 Antimony, Total Monitoring, Regular Resolved
January 1, 1992 Selenium Monitoring, Regular Resolved
January 1, 1992 Fluoride Monitoring, Regular Resolved
January 1, 1992 Arsenic Monitoring, Regular Resolved
January 1, 1992 Cyanide Monitoring, Regular Resolved
January 1, 1992 Fluoride Monitoring, Regular Resolved
January 1, 1992 Nickel Monitoring, Regular Resolved
January 1, 1992 Antimony, Total Monitoring, Regular Resolved
January 1, 1992 Mercury Monitoring, Regular Resolved
January 1, 1992 Selenium Monitoring, Regular Resolved
January 1, 1992 Thallium, Total Monitoring, Regular Resolved
January 1, 1992 Beryllium, Total Monitoring, Regular Resolved
January 1, 1992 Beryllium, Total Monitoring, Regular Resolved
January 1, 1992 Beryllium, Total Monitoring, Regular Resolved
January 1, 1992 Beryllium, Total Monitoring, Regular Resolved
January 1, 1992 Cadmium Monitoring, Regular Resolved
January 1, 1992 Cadmium Monitoring, Regular Resolved
January 1, 1992 Cadmium Monitoring, Regular Resolved
January 1, 1992 Cadmium Monitoring, Regular Resolved
January 1, 1992 Chromium Monitoring, Regular Resolved
January 1, 1992 Chromium Monitoring, Regular Resolved
January 1, 1992 Chromium Monitoring, Regular Resolved
January 1, 1992 Chromium Monitoring, Regular Resolved
January 1, 1992 Cadmium Monitoring, Regular Resolved
January 1, 1992 Beryllium, Total Monitoring, Regular Resolved
January 1, 1992 Nickel Monitoring, Regular Resolved
January 1, 1992 Nickel Monitoring, Regular Resolved
January 1, 1992 Nickel Monitoring, Regular Resolved
January 1, 1992 Nickel Monitoring, Regular Resolved
January 1, 1992 Mercury Monitoring, Regular Resolved
January 1, 1992 Mercury Monitoring, Regular Resolved
January 1, 1992 Mercury Monitoring, Regular Resolved
January 1, 1992 Mercury Monitoring, Regular Resolved
January 1, 1992 Barium Monitoring, Regular Resolved
January 1, 1992 Chromium Monitoring, Regular Resolved

Where to see every contaminant this utility tested for

EPA's bulk SDWIS dataset gives MyTapWater.us per-system measured values for lead and copper, plus violation records for everything else. To see every regulated contaminant this utility tested for in the past year (TTHMs, HAA5, nitrate, arsenic, fluoride, chromium, etc.) with measured values, read the utility's Consumer Confidence Report (CCR).

Every community water system is required by EPA to publish a CCR annually, by July 1, listing every contaminant they sampled, the measured value, the federal limit, and any health-based exceedances. Most utilities post the report online; some mail it with your bill.

How to find BOGUE BANKS WATER CORPORATION's CCR:

  • Search "BOGUE BANKS WATER CORPORATION consumer confidence report" in your browser. The PDF is usually on the utility's own website.
  • Or check EPA's CCR finder for NC0416028 (some utilities upload theirs to EPA, some do not).
  • Or call the utility directly. Their phone number is in the contact section below.

Contact this utility

Public administrative contact information for this water system, as filed with the EPA. Use this to ask about your service line, request your home's lead status, or report a water quality issue.

Administrator
HILL, SEOLA (HILL, SEOLA)
Phone
252-354-3307
Email
shill@boguebankswater.com
Mailing address
PO BOX 4009
EMERALD ISLE, NC, 28594