PWSID NC0368152
OAK GROVE MHP
Community water system serving CHAPEL HILL, NC
See also: all utilities in Chapel Hill · utilities by ZIP 27516
- Population served
- 64
- Source
- Groundwater
- Status
- Active
Current water quality
Not enough recent measurement data to classify current risk
No recent Lead and Copper Rule sample data on file from this system. Most other contaminants are tracked through violation reports rather than per-page sample tables.
Risk classification follows EPA published MCL / MCLG / HAL values with caution and concern bands reviewed by a clinician. Past resolved violations do not influence this badge. See methodology.
Lead service line inventory
No inventory data on file
We do not yet have this utility's published Lead Service Line Inventory on file. The EPA Lead and Copper Rule Improvements (LCRI) required every community water system to publish one by October 16, 2024 and to identify and replace any lead lines within 10 years. How lead enters drinking water.
Phase 1 coverage focuses on the largest NC utilities. Smaller systems will be added; in the meantime, ask your utility for their inventory or check their Consumer Confidence Report.
Lead and Copper Rule sample data
The most recent measurement per contaminant from EPA's Lead and Copper Rule (LCR) sample table. This is the only per-system sample data EPA publishes in the bulk SDWIS download; values for other regulated contaminants (TTHMs, nitrate, arsenic, etc.) are tracked on this page only when they trigger a violation.
No recent Lead and Copper sample data
EPA's national SDWIS bulk dataset does not include Lead and Copper Rule sampling rows for this system in the most recent release. That can mean the system is small enough to be on a reduced sampling schedule, or that recent samples have not yet been submitted to EPA. Check the system's annual Consumer Confidence Report (see below) for the most recent local measurements.
Compliance history
EPA-recorded violations against this system over the last 5 years. Health-based violations are when a measured limit was exceeded; monitoring and reporting items are paperwork issues (missed sample dates, late filings) that do not themselves indicate unsafe water.
No health-based violations
No health-based violations on file in the last 5 years. EPA recorded 29 monitoring or reporting items (paperwork) during the same period.
29 monitoring and reporting item s (paperwork) , 6 still open · these are not health risks
| Period start | Relates to | Item | Status |
|---|---|---|---|
| April 1, 2025 | Revised Total Coliform Rule | Monitoring, Routine (RTCR) | Resolved |
| April 1, 2025 | Revised Total Coliform Rule | Monitoring, Routine (RTCR) | Resolved |
| April 1, 2025 | Revised Total Coliform Rule | Monitoring, Routine (RTCR) | Resolved |
| April 1, 2025 | Revised Total Coliform Rule | Monitoring, Routine (RTCR) | Resolved |
| January 1, 2025 | Revised Total Coliform Rule | Monitoring, Routine (RTCR) | Resolved |
| January 1, 2025 | Revised Total Coliform Rule | Monitoring, Routine (RTCR) | Resolved |
| January 1, 2025 | Revised Total Coliform Rule | Monitoring, Routine (RTCR) | Resolved |
| January 1, 2025 | Revised Total Coliform Rule | Monitoring, Routine (RTCR) | Resolved |
| January 1, 2025 | Revised Total Coliform Rule | Monitoring, Routine (RTCR) | Resolved |
| October 1, 2024 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Addressed |
| October 1, 2024 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Addressed |
| October 1, 2024 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Addressed |
| October 1, 2024 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Addressed |
| February 10, 2024 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| February 10, 2024 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| February 10, 2024 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| January 1, 2023 | Lead and Copper Rule | Lead Consumer Notice | Resolved |
| January 1, 2023 | Lead and Copper Rule | Lead Consumer Notice | Resolved |
| January 1, 2023 | Lead and Copper Rule | Lead Consumer Notice | Resolved |
| October 29, 2021 | Public Notice | Public Notification Violation for NPDWR Violation | Addressed |
| October 29, 2021 | Public Notice | Public Notification Violation for NPDWR Violation | Addressed |
| October 1, 2021 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| October 1, 2021 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| October 1, 2021 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| October 1, 2021 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| October 1, 2021 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| July 1, 2021 | Consumer Confidence Rule | Consumer Confidence Report Complete Failure to Report | Resolved |
| July 1, 2021 | Consumer Confidence Rule | Consumer Confidence Report Complete Failure to Report | Resolved |
| July 1, 2021 | Consumer Confidence Rule | Consumer Confidence Report Complete Failure to Report | Resolved |
305 older violation s (more than 5 years ago)
| Period start | Relates to | Item | Status |
|---|---|---|---|
| October 7, 2020 | E. Coli | Monitoring, Source Water (GWR) | Addressed |
| October 7, 2020 | E. Coli | Monitoring, Source Water (GWR) | Addressed |
| October 7, 2020 | E. Coli | Monitoring, Source Water (GWR) | Addressed |
| July 1, 2020 | Consumer Confidence Rule | Consumer Confidence Report Complete Failure to Report | Resolved |
| January 1, 2020 | Asbestos | Monitoring, Regular | Resolved |
| January 1, 2020 | Asbestos | Monitoring, Regular | Resolved |
| January 1, 2020 | Asbestos | Monitoring, Regular | Resolved |
| January 1, 2020 | Asbestos | Monitoring, Regular | Resolved |
| January 1, 2020 | Asbestos | Monitoring, Regular | Resolved |
| January 1, 2019 | Lead and Copper Rule | Lead Consumer Notice | Resolved |
| January 1, 2019 | Lead and Copper Rule | Lead Consumer Notice | Resolved |
| January 1, 2019 | Lead and Copper Rule | Lead Consumer Notice | Resolved |
| July 1, 2014 | Consumer Confidence Rule | Consumer Confidence Report Complete Failure to Report | Resolved |
| July 1, 2013 | Consumer Confidence Rule | Consumer Confidence Report Complete Failure to Report | Resolved |
| October 1, 2012 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| October 1, 2012 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| October 1, 2012 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| October 1, 2012 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| October 1, 2012 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| January 1, 2012 | Nitrate | Monitoring, Regular | Resolved |
| January 1, 2012 | Nitrate | Monitoring, Regular | Resolved |
| January 1, 2012 | Nitrate | Monitoring, Regular | Resolved |
| January 1, 2012 | Nitrate | Monitoring, Regular | Resolved |
| January 1, 2012 | Nitrate | Monitoring, Regular | Resolved |
| November 13, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| November 13, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| September 25, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| September 25, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| September 18, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| September 18, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| August 1, 2009 | Coliform (Tcr) | Maximum Contaminant Level Violation, Monthly (TCR) | Resolved |
| August 1, 2009 | Coliform (Tcr) | Maximum Contaminant Level Violation, Monthly (TCR) | Resolved |
| August 1, 2009 | Coliform (Tcr) | Maximum Contaminant Level Violation, Monthly (TCR) | Resolved |
| July 26, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 26, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 26, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 26, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 26, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 26, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 19, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 19, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 19, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 19, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 19, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 19, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 19, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 19, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| June 4, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| June 4, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| January 8, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| January 8, 2009 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| November 16, 2008 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| November 16, 2008 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| October 23, 2008 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| October 23, 2008 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| October 23, 2008 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| October 23, 2008 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| October 23, 2008 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| October 23, 2008 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 1, 2008 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| July 1, 2008 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| July 1, 2008 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| July 1, 2008 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| June 14, 2008 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| June 14, 2008 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| April 1, 2008 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| April 1, 2008 | Radium-226 | Monitoring, Regular | Resolved |
| April 1, 2008 | Radium-226 | Monitoring, Regular | Resolved |
| April 1, 2008 | Radium-228 | Monitoring, Regular | Resolved |
| April 1, 2008 | Radium-228 | Monitoring, Regular | Resolved |
| April 1, 2008 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| April 1, 2008 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| April 1, 2008 | Radium-226 | Monitoring, Regular | Resolved |
| April 1, 2008 | Radium-228 | Monitoring, Regular | Resolved |
| April 1, 2008 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| April 1, 2008 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| April 1, 2008 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| April 1, 2008 | Combined Uranium | Monitoring, Regular | Resolved |
| April 1, 2008 | Combined Uranium | Monitoring, Regular | Resolved |
| April 1, 2008 | Combined Uranium | Monitoring, Regular | Resolved |
| March 26, 2008 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| March 26, 2008 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| January 1, 2008 | Methoxychlor | Monitoring, Regular | Resolved |
| January 1, 2008 | Methoxychlor | Monitoring, Regular | Resolved |
| January 1, 2008 | Methoxychlor | Monitoring, Regular | Resolved |
| January 1, 2008 | Methoxychlor | Monitoring, Regular | Resolved |
| January 1, 2008 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| January 1, 2008 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| January 1, 2008 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| January 1, 2008 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| January 1, 2008 | Endrin | Monitoring, Regular | Resolved |
| January 1, 2008 | Endrin | Monitoring, Regular | Resolved |
| January 1, 2008 | Endrin | Monitoring, Regular | Resolved |
| January 1, 2008 | Endrin | Monitoring, Regular | Resolved |
| January 1, 2008 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| January 1, 2008 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| January 1, 2008 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| January 1, 2008 | Radium-228 | Monitoring, Regular | Resolved |
| January 1, 2008 | Radium-228 | Monitoring, Regular | Resolved |
| January 1, 2008 | Radium-228 | Monitoring, Regular | Resolved |
| January 1, 2008 | Methoxychlor | Monitoring, Regular | Resolved |
| January 1, 2008 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| January 1, 2008 | Endrin | Monitoring, Regular | Resolved |
| January 1, 2008 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| January 1, 2008 | Radium-228 | Monitoring, Regular | Resolved |
| January 1, 2008 | Radium-226 | Monitoring, Regular | Resolved |
| January 1, 2008 | Radium-226 | Monitoring, Regular | Resolved |
| January 1, 2008 | Radium-226 | Monitoring, Regular | Resolved |
| January 1, 2008 | Radium-226 | Monitoring, Regular | Resolved |
| January 1, 2008 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| January 1, 2008 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| January 1, 2008 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| January 1, 2008 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| January 1, 2008 | Combined Uranium | Monitoring, Regular | Resolved |
| January 1, 2008 | Combined Uranium | Monitoring, Regular | Resolved |
| January 1, 2008 | Combined Uranium | Monitoring, Regular | Resolved |
| January 1, 2008 | Combined Uranium | Monitoring, Regular | Resolved |
| January 1, 2008 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| January 1, 2008 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| January 1, 2008 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| January 1, 2008 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| October 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| October 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| October 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| October 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| October 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| October 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| October 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| October 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| October 1, 2007 | Consumer Confidence Rule | Consumer Confidence Report Inadequate Reporting | Resolved |
| October 1, 2007 | Consumer Confidence Rule | Consumer Confidence Report Inadequate Reporting | Resolved |
| October 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| October 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| October 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| September 26, 2007 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| September 26, 2007 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| July 1, 2007 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| July 1, 2007 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| July 1, 2007 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| July 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| July 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| July 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| July 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| July 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| July 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| July 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| July 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| July 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| July 1, 2007 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| July 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| July 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| July 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| July 1, 2007 | Consumer Confidence Rule | Consumer Confidence Report Complete Failure to Report | Resolved |
| July 1, 2007 | Consumer Confidence Rule | Consumer Confidence Report Complete Failure to Report | Resolved |
| July 1, 2007 | Consumer Confidence Rule | Consumer Confidence Report Complete Failure to Report | Resolved |
| July 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| July 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| July 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| July 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| July 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| July 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| July 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| July 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| June 29, 2007 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| June 29, 2007 | Public Notice | Public Notification Violation for NPDWR Violation | Resolved |
| April 1, 2007 | Endrin | Monitoring, Regular | Resolved |
| April 1, 2007 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| April 1, 2007 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| April 1, 2007 | Methoxychlor | Monitoring, Regular | Resolved |
| April 1, 2007 | Methoxychlor | Monitoring, Regular | Resolved |
| April 1, 2007 | Endrin | Monitoring, Regular | Resolved |
| April 1, 2007 | Methoxychlor | Monitoring, Regular | Resolved |
| April 1, 2007 | Endrin | Monitoring, Regular | Resolved |
| April 1, 2007 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| April 1, 2007 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| April 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| April 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| April 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| April 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| April 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| April 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| April 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| April 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| April 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| April 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| April 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| April 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| April 1, 2007 | Methoxychlor | Monitoring, Regular | Resolved |
| April 1, 2007 | Endrin | Monitoring, Regular | Resolved |
| April 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| April 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| April 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| April 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| April 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| April 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| April 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| April 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| January 1, 2007 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| January 1, 2007 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| January 1, 2007 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| January 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| January 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| January 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| January 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| January 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| January 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| January 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| January 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| January 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| January 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| January 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| January 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| January 1, 2007 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| January 1, 2007 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| January 1, 2007 | Combined Uranium | Monitoring, Regular | Resolved |
| January 1, 2007 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| January 1, 2007 | Radium-228 | Monitoring, Regular | Resolved |
| January 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| January 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| January 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| January 1, 2007 | Radium-226 | Monitoring, Regular | Resolved |
| October 1, 2006 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| October 1, 2006 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| October 1, 2006 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| July 1, 2006 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| July 1, 2006 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| July 1, 2006 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| July 1, 2006 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| July 1, 2006 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| July 1, 2006 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| July 1, 2006 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| July 1, 2006 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| July 1, 2006 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| April 1, 2006 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| April 1, 2006 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| April 1, 2006 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| April 1, 2006 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| April 1, 2006 | Di(2-Ethylhexyl) Phthalate | Monitoring, Regular | Resolved |
| January 1, 2006 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| January 1, 2006 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| January 1, 2006 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| January 1, 2006 | Lead and Copper Rule | Follow-up Or Routine LCR Tap M/R | Resolved |
| January 1, 2005 | Lead and Copper Rule | Public Education | Resolved |
| January 1, 2005 | Lead and Copper Rule | Public Education | Resolved |
| January 1, 2005 | Lead and Copper Rule | Public Education | Resolved |
| January 1, 2005 | Lead and Copper Rule | Public Education | Resolved |
| January 1, 2005 | Lead and Copper Rule | Public Education | Resolved |
| January 1, 2005 | Lead and Copper Rule | Public Education | Resolved |
| August 13, 2003 | Public Notice | Public Notification Violation without NPDWR Violation | Resolved |
| August 13, 2003 | Public Notice | Public Notification Violation without NPDWR Violation | Resolved |
| August 13, 2002 | Public Notice | Public Notification Violation without NPDWR Violation | Resolved |
| August 13, 2002 | Public Notice | Public Notification Violation without NPDWR Violation | Resolved |
| August 1, 2002 | Coliform (Tcr) | Monitoring, Routine Major (TCR) | Resolved |
| August 1, 2002 | Coliform (Tcr) | Monitoring, Routine Major (TCR) | Resolved |
| August 1, 2002 | Coliform (Tcr) | Monitoring, Routine Major (TCR) | Resolved |
| July 1, 2002 | Coliform (Tcr) | Maximum Contaminant Level Violation, Monthly (TCR) | Resolved |
| July 1, 2002 | Coliform (Tcr) | Maximum Contaminant Level Violation, Monthly (TCR) | Resolved |
| July 1, 2002 | Coliform (Tcr) | Maximum Contaminant Level Violation, Monthly (TCR) | Resolved |
| June 1, 2002 | Coliform (Tcr) | Monitoring, Repeat Major (TCR) | Resolved |
| June 1, 2002 | Coliform (Tcr) | Monitoring, Repeat Major (TCR) | Resolved |
| June 1, 2002 | Coliform (Tcr) | Monitoring, Repeat Major (TCR) | Resolved |
| October 19, 1999 | Consumer Confidence Rule | Consumer Confidence Report Complete Failure to Report | Resolved |
| October 19, 1999 | Consumer Confidence Rule | Consumer Confidence Report Complete Failure to Report | Resolved |
| October 19, 1999 | Consumer Confidence Rule | Consumer Confidence Report Complete Failure to Report | Resolved |
| September 1, 1999 | Coliform (Tcr) | Monitoring, Routine Minor (TCR) | Resolved |
| September 1, 1999 | Coliform (Tcr) | Monitoring, Routine Minor (TCR) | Resolved |
| September 1, 1999 | Coliform (Tcr) | Monitoring, Routine Minor (TCR) | Resolved |
| August 1, 1999 | Coliform (Tcr) | Monitoring, Repeat Major (TCR) | Resolved |
| August 1, 1999 | Coliform (Tcr) | Monitoring, Repeat Major (TCR) | Resolved |
| August 1, 1999 | Coliform (Tcr) | Monitoring, Repeat Major (TCR) | Resolved |
| August 1, 1999 | Coliform (Tcr) | Monitoring, Routine Minor (TCR) | Resolved |
| August 1, 1999 | Coliform (Tcr) | Monitoring, Routine Minor (TCR) | Resolved |
| August 1, 1999 | Coliform (Tcr) | Monitoring, Routine Minor (TCR) | Resolved |
| October 1, 1980 | Gross Alpha, Excl. Radon and U | Monitoring, Regular | Resolved |
| October 1, 1980 | Combined Radium (-226 and -228) | Monitoring, Regular | Resolved |
| October 1, 1980 | Gross Beta Particle Activity | Monitoring, Regular | Resolved |
Where to see every contaminant this utility tested for
EPA's bulk SDWIS dataset gives MyTapWater.us per-system measured values for lead and copper, plus violation records for everything else. To see every regulated contaminant this utility tested for in the past year (TTHMs, HAA5, nitrate, arsenic, fluoride, chromium, etc.) with measured values, read the utility's Consumer Confidence Report (CCR).
Every community water system is required by EPA to publish a CCR annually, by July 1, listing every contaminant they sampled, the measured value, the federal limit, and any health-based exceedances. Most utilities post the report online; some mail it with your bill.
How to find OAK GROVE MHP's CCR:
-
Search
"OAK GROVE MHP consumer confidence report"in your browser. The PDF is usually on the utility's own website. - Or check EPA's CCR finder for NC0368152 (some utilities upload theirs to EPA, some do not).
- Or call the utility directly. Their phone number is in the contact section below.
Contact this utility
Public administrative contact information for this water system, as filed with the EPA. Use this to ask about your service line, request your home's lead status, or report a water quality issue.
- Administrator
- FARRELL, MARK (FARRELL, MARK)
- Phone
- 919-428-0292
- ljfarrell18@yahoo.com
- Mailing address
- 215 MARKS LANECHAPEL HILL, NC, 27516