Skip to main content
MyTapWater.us

PWSID NC0201118

KIRBY`S MHP

Community water system serving MEBANE, NC

See also: all utilities in Mebane · utilities by ZIP 27302

Population served
60
Source
Groundwater
Status
Active

Current water quality

Current measurements are below regulatory thresholds

Lead measured at 0 mg/L in the most recent sample (below regulatory thresholds).

Risk classification follows EPA published MCL / MCLG / HAL values with caution and concern bands reviewed by a clinician. Past resolved violations do not influence this badge. See methodology.

Lead service line inventory

No inventory data on file

We do not yet have this utility's published Lead Service Line Inventory on file. The EPA Lead and Copper Rule Improvements (LCRI) required every community water system to publish one by October 16, 2024 and to identify and replace any lead lines within 10 years. How lead enters drinking water.

Phase 1 coverage focuses on the largest NC utilities. Smaller systems will be added; in the meantime, ask your utility for their inventory or check their Consumer Confidence Report.

Lead and Copper Rule sample data

The most recent measurement per contaminant from EPA's Lead and Copper Rule (LCR) sample table. This is the only per-system sample data EPA publishes in the bulk SDWIS download; values for other regulated contaminants (TTHMs, nitrate, arsenic, etc.) are tracked on this page only when they trigger a violation.

Most recent measurements per contaminant (Lead and Copper Rule) . Sorted by risk: concern first, then caution, then unrated, then safe.
Contaminant Most recent Date Risk
PB90
0 mg/L December 31, 2025 Below regulatory thresholds

Lead has no safe level (MCLG=0). LCR action level is 0.015 mg/L for the 90th-percentile sample; the LCRI (Oct 2024) lowers the action level to 0.010 mg/L effective Nov 2027. Caution at any detection above LOD; concern anchored to the future LCRI value (0.010 mg/L) for forward consistency. Learn more about Lead. Source.

Compliance history

EPA-recorded violations against this system over the last 5 years. Health-based violations are when a measured limit was exceeded; monitoring and reporting items are paperwork issues (missed sample dates, late filings) that do not themselves indicate unsafe water.

No health-based violations

No health-based violations on file in the last 5 years. EPA recorded 13 monitoring or reporting items (paperwork) during the same period.

13 monitoring and reporting item s (paperwork) , 8 still open · these are not health risks
Monitoring and reporting items in the last 5 years
Period start Relates to Item Status
January 1, 2025 Lead and Copper Rule Lead Consumer Notice Addressed
January 1, 2025 Lead and Copper Rule Lead Consumer Notice Addressed
January 1, 2024 Lead and Copper Rule Lead Consumer Notice Addressed
January 1, 2024 Lead and Copper Rule Lead Consumer Notice Addressed
January 1, 2023 Lead and Copper Rule Lead Consumer Notice Addressed
January 1, 2023 Lead and Copper Rule Lead Consumer Notice Addressed
January 1, 2022 Lead and Copper Rule Lead Consumer Notice Addressed
January 1, 2022 Lead and Copper Rule Lead Consumer Notice Addressed
October 1, 2021 Nitrate Monitoring, Regular Resolved
October 1, 2021 Nitrate Monitoring, Regular Resolved
October 1, 2021 Nitrate Monitoring, Regular Resolved
October 1, 2021 Nitrate Monitoring, Regular Resolved
October 1, 2021 Nitrate Monitoring, Regular Resolved
702 older violation s (more than 5 years ago)
Violations older than 5 years (702 total)
Period start Relates to Item Status
January 30, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 30, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 30, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 1, 2021 Lead and Copper Rule Lead Consumer Notice Addressed
January 1, 2021 Lead and Copper Rule Lead Consumer Notice Addressed
October 1, 2020 Nitrate Monitoring, Regular Resolved
October 1, 2020 Nitrate Monitoring, Regular Resolved
October 1, 2020 Nitrate Monitoring, Regular Resolved
October 1, 2020 Nitrate Monitoring, Regular Resolved
October 1, 2020 Nitrate Monitoring, Regular Resolved
October 1, 2020 Nitrate Monitoring, Regular Resolved
October 1, 2019 Nitrate Monitoring, Regular Resolved
October 1, 2019 Nitrate Monitoring, Regular Resolved
October 1, 2019 Nitrate Monitoring, Regular Resolved
October 1, 2019 Nitrate Monitoring, Regular Resolved
October 1, 2019 Nitrate Monitoring, Regular Resolved
October 1, 2019 Nitrate Monitoring, Regular Resolved
July 1, 2019 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
January 1, 2019 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2019 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2019 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2018 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2018 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2018 Lead and Copper Rule Lead Consumer Notice Resolved
July 1, 2017 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2017 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2017 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
April 30, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 30, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 30, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 1, 2017 Lead and Copper Rule Lead Consumer Notice Resolved
April 1, 2017 Lead and Copper Rule Lead Consumer Notice Resolved
April 1, 2017 Lead and Copper Rule Lead Consumer Notice Resolved
November 26, 2015 Public Notice Public Notification Violation for NPDWR Violation Resolved
November 26, 2015 Public Notice Public Notification Violation for NPDWR Violation Resolved
November 26, 2015 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2015 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2015 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2015 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2015 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2015 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2015 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2015 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2015 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
July 1, 2015 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2015 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2015 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
April 16, 2015 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 16, 2015 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 16, 2015 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 1, 2015 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2015 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2015 Lead and Copper Rule Lead Consumer Notice Resolved
October 10, 2014 E. Coli Monitoring, Source Water (GWR) Resolved
October 10, 2014 E. Coli Monitoring, Source Water (GWR) Resolved
October 10, 2014 E. Coli Monitoring, Source Water (GWR) Resolved
October 10, 2014 E. Coli Monitoring, Source Water (GWR) Resolved
October 10, 2014 E. Coli Monitoring, Source Water (GWR) Resolved
July 25, 2014 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 25, 2014 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 25, 2014 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 1, 2014 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2014 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2014 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
April 18, 2014 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2014 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2014 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 1, 2013 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
May 8, 2013 E. Coli Monitoring, Source Water (GWR) Resolved
May 8, 2013 E. Coli Monitoring, Source Water (GWR) Resolved
May 8, 2013 E. Coli Monitoring, Source Water (GWR) Resolved
May 8, 2013 E. Coli Monitoring, Source Water (GWR) Resolved
October 1, 2012 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2012 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2012 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2012 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2012 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2012 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2012 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2012 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
April 11, 2012 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 11, 2012 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 11, 2012 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2011 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2011 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2011 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2011 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2011 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2011 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2011 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2011 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
July 1, 2011 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2011 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2011 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2011 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2011 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
June 5, 2011 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 5, 2011 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 5, 2011 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 8, 2011 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 8, 2011 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 8, 2011 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 1, 2011 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2011 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2011 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2011 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2011 Trichloroethylene Monitoring, Regular Resolved
January 1, 2011 Trichloroethylene Monitoring, Regular Resolved
January 1, 2011 Trichloroethylene Monitoring, Regular Resolved
January 1, 2011 Trichloroethylene Monitoring, Regular Resolved
January 1, 2011 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2011 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2011 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2011 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2011 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2011 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2011 Trichloroethylene Monitoring, Regular Resolved
January 1, 2011 Trichloroethylene Monitoring, Regular Resolved
January 1, 2011 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2011 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2011 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2011 Trichloroethylene Monitoring, Regular Resolved
January 1, 2011 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2011 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2011 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2011 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2011 Trichloroethylene Monitoring, Regular Resolved
January 1, 2011 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2011 Styrene Monitoring, Regular Resolved
January 1, 2011 Styrene Monitoring, Regular Resolved
January 1, 2011 Styrene Monitoring, Regular Resolved
January 1, 2011 Styrene Monitoring, Regular Resolved
January 1, 2011 Styrene Monitoring, Regular Resolved
January 1, 2011 Styrene Monitoring, Regular Resolved
January 1, 2011 Styrene Monitoring, Regular Resolved
January 1, 2011 Styrene Monitoring, Regular Resolved
January 1, 2011 Xylenes, Total Monitoring, Regular Resolved
January 1, 2011 Xylenes, Total Monitoring, Regular Resolved
January 1, 2011 Xylenes, Total Monitoring, Regular Resolved
January 1, 2011 Xylenes, Total Monitoring, Regular Resolved
January 1, 2011 Xylenes, Total Monitoring, Regular Resolved
January 1, 2011 Xylenes, Total Monitoring, Regular Resolved
January 1, 2011 Xylenes, Total Monitoring, Regular Resolved
January 1, 2011 Xylenes, Total Monitoring, Regular Resolved
January 1, 2011 Benzene Monitoring, Regular Resolved
January 1, 2011 Benzene Monitoring, Regular Resolved
January 1, 2011 Benzene Monitoring, Regular Resolved
January 1, 2011 Benzene Monitoring, Regular Resolved
January 1, 2011 Benzene Monitoring, Regular Resolved
January 1, 2011 Benzene Monitoring, Regular Resolved
January 1, 2011 Benzene Monitoring, Regular Resolved
January 1, 2011 Benzene Monitoring, Regular Resolved
January 1, 2011 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2011 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2011 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2011 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2011 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2011 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2011 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2011 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2011 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2011 Ethylbenzene Monitoring, Regular Resolved
January 1, 2011 Ethylbenzene Monitoring, Regular Resolved
January 1, 2011 Ethylbenzene Monitoring, Regular Resolved
January 1, 2011 Ethylbenzene Monitoring, Regular Resolved
January 1, 2011 Ethylbenzene Monitoring, Regular Resolved
January 1, 2011 Ethylbenzene Monitoring, Regular Resolved
January 1, 2011 Ethylbenzene Monitoring, Regular Resolved
January 1, 2011 Ethylbenzene Monitoring, Regular Resolved
January 1, 2011 Dichloromethane Monitoring, Regular Resolved
January 1, 2011 Dichloromethane Monitoring, Regular Resolved
January 1, 2011 Dichloromethane Monitoring, Regular Resolved
January 1, 2011 Dichloromethane Monitoring, Regular Resolved
January 1, 2011 Dichloromethane Monitoring, Regular Resolved
January 1, 2011 Dichloromethane Monitoring, Regular Resolved
January 1, 2011 Dichloromethane Monitoring, Regular Resolved
January 1, 2011 Dichloromethane Monitoring, Regular Resolved
January 1, 2011 Toluene Monitoring, Regular Resolved
January 1, 2011 Toluene Monitoring, Regular Resolved
January 1, 2011 Toluene Monitoring, Regular Resolved
January 1, 2011 Toluene Monitoring, Regular Resolved
January 1, 2011 Toluene Monitoring, Regular Resolved
January 1, 2011 Toluene Monitoring, Regular Resolved
January 1, 2011 Toluene Monitoring, Regular Resolved
January 1, 2011 Toluene Monitoring, Regular Resolved
January 1, 2011 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2011 Chlorobenzene Monitoring, Regular Resolved
January 1, 2011 Chlorobenzene Monitoring, Regular Resolved
January 1, 2011 Chlorobenzene Monitoring, Regular Resolved
January 1, 2011 Chlorobenzene Monitoring, Regular Resolved
January 1, 2011 Chlorobenzene Monitoring, Regular Resolved
January 1, 2011 Chlorobenzene Monitoring, Regular Resolved
January 1, 2011 Chlorobenzene Monitoring, Regular Resolved
January 1, 2011 Chlorobenzene Monitoring, Regular Resolved
January 1, 2011 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2011 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2011 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2011 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2011 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2011 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2011 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2011 Vinyl Chloride Monitoring, Regular Resolved
October 1, 2010 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2010 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2010 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2010 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2010 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2010 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
September 19, 2010 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 19, 2010 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 19, 2010 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 1, 2010 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2010 Combined Uranium Monitoring, Regular Resolved
July 1, 2010 Radium-226 Monitoring, Regular Resolved
July 1, 2010 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2010 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2010 Combined Uranium Monitoring, Regular Resolved
July 1, 2010 Combined Uranium Monitoring, Regular Resolved
July 1, 2010 Combined Uranium Monitoring, Regular Resolved
July 1, 2010 Combined Uranium Monitoring, Regular Resolved
July 1, 2010 Combined Uranium Monitoring, Regular Resolved
July 1, 2010 Combined Uranium Monitoring, Regular Resolved
July 1, 2010 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2010 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2010 Radium-226 Monitoring, Regular Resolved
July 1, 2010 Radium-226 Monitoring, Regular Resolved
July 1, 2010 Radium-226 Monitoring, Regular Resolved
July 1, 2010 Radium-226 Monitoring, Regular Resolved
July 1, 2010 Radium-226 Monitoring, Regular Resolved
July 1, 2010 Radium-226 Monitoring, Regular Resolved
July 1, 2010 Combined Uranium Monitoring, Regular Resolved
July 1, 2010 Radium-226 Monitoring, Regular Resolved
July 1, 2010 Radium-228 Monitoring, Regular Resolved
July 1, 2010 Radium-228 Monitoring, Regular Resolved
July 1, 2010 Radium-228 Monitoring, Regular Resolved
July 1, 2010 Radium-228 Monitoring, Regular Resolved
July 1, 2010 Radium-228 Monitoring, Regular Resolved
July 1, 2010 Radium-228 Monitoring, Regular Resolved
July 1, 2010 Radium-228 Monitoring, Regular Resolved
July 1, 2010 Radium-228 Monitoring, Regular Resolved
July 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
June 13, 2010 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 13, 2010 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 13, 2010 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 28, 2010 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 13, 2010 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2010 Combined Uranium Monitoring, Regular Resolved
January 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2010 Radium-226 Monitoring, Regular Resolved
January 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2010 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2010 Combined Uranium Monitoring, Regular Resolved
January 1, 2010 Combined Uranium Monitoring, Regular Resolved
January 1, 2010 Combined Uranium Monitoring, Regular Resolved
January 1, 2010 Combined Uranium Monitoring, Regular Resolved
January 1, 2010 Combined Uranium Monitoring, Regular Resolved
January 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2010 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2010 Radium-226 Monitoring, Regular Resolved
January 1, 2010 Radium-226 Monitoring, Regular Resolved
January 1, 2010 Radium-226 Monitoring, Regular Resolved
January 1, 2010 Radium-226 Monitoring, Regular Resolved
January 1, 2010 Radium-226 Monitoring, Regular Resolved
January 1, 2010 Radium-228 Monitoring, Regular Resolved
January 1, 2010 Radium-228 Monitoring, Regular Resolved
January 1, 2010 Radium-228 Monitoring, Regular Resolved
January 1, 2010 Radium-228 Monitoring, Regular Resolved
January 1, 2010 Radium-228 Monitoring, Regular Resolved
January 1, 2010 Radium-228 Monitoring, Regular Resolved
November 13, 2009 Public Notice Public Notification Violation for NPDWR Violation Resolved
November 13, 2009 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2009 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2009 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2009 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2009 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2009 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2009 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
September 25, 2009 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 25, 2009 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 1, 2009 Coliform (Tcr) Monitoring, Routine Minor (TCR) Resolved
September 1, 2009 Coliform (Tcr) Monitoring, Routine Minor (TCR) Resolved
September 1, 2009 Coliform (Tcr) Monitoring, Routine Minor (TCR) Resolved
September 1, 2009 Coliform (Tcr) Monitoring, Routine Minor (TCR) Resolved
September 1, 2009 Coliform (Tcr) Monitoring, Routine Minor (TCR) Resolved
September 1, 2009 Coliform (Tcr) Monitoring, Routine Minor (TCR) Resolved
July 1, 2009 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2009 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2009 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2009 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2009 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2009 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
June 4, 2009 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 4, 2009 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 1, 2009 Combined Uranium Monitoring, Regular Resolved
April 1, 2009 Combined Uranium Monitoring, Regular Resolved
April 1, 2009 Combined Uranium Monitoring, Regular Resolved
April 1, 2009 Combined Uranium Monitoring, Regular Resolved
April 1, 2009 Combined Uranium Monitoring, Regular Resolved
April 1, 2009 Radium-226 Monitoring, Regular Resolved
April 1, 2009 Radium-226 Monitoring, Regular Resolved
April 1, 2009 Radium-226 Monitoring, Regular Resolved
April 1, 2009 Radium-226 Monitoring, Regular Resolved
April 1, 2009 Radium-226 Monitoring, Regular Resolved
April 1, 2009 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2009 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2009 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2009 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2009 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2009 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2009 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2009 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2009 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2009 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2009 Radium-228 Monitoring, Regular Resolved
April 1, 2009 Radium-228 Monitoring, Regular Resolved
April 1, 2009 Radium-228 Monitoring, Regular Resolved
April 1, 2009 Radium-228 Monitoring, Regular Resolved
April 1, 2009 Radium-228 Monitoring, Regular Resolved
January 1, 2009 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2009 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2009 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2009 Combined Uranium Monitoring, Regular Resolved
January 1, 2009 Combined Uranium Monitoring, Regular Resolved
January 1, 2009 Combined Uranium Monitoring, Regular Resolved
January 1, 2009 Radium-226 Monitoring, Regular Resolved
January 1, 2009 Radium-226 Monitoring, Regular Resolved
January 1, 2009 Radium-226 Monitoring, Regular Resolved
January 1, 2009 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2009 Combined Uranium Monitoring, Regular Resolved
January 1, 2009 Radium-226 Monitoring, Regular Resolved
January 1, 2009 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2009 Combined Uranium Monitoring, Regular Resolved
January 1, 2009 Radium-226 Monitoring, Regular Resolved
January 1, 2009 Radium-228 Monitoring, Regular Resolved
January 1, 2009 Radium-228 Monitoring, Regular Resolved
January 1, 2009 Radium-228 Monitoring, Regular Resolved
January 1, 2009 Radium-228 Monitoring, Regular Resolved
January 1, 2009 Radium-228 Monitoring, Regular Resolved
January 1, 2009 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2009 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2009 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2009 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2009 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2008 Radium-228 Monitoring, Regular Resolved
October 1, 2008 Radium-228 Monitoring, Regular Resolved
October 1, 2008 Radium-228 Monitoring, Regular Resolved
October 1, 2008 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2008 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2008 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2008 Radium-228 Monitoring, Regular Resolved
October 1, 2008 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2008 Radium-228 Monitoring, Regular Resolved
October 1, 2008 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2008 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2008 Radium-226 Monitoring, Regular Resolved
October 1, 2008 Radium-226 Monitoring, Regular Resolved
October 1, 2008 Radium-226 Monitoring, Regular Resolved
October 1, 2008 Combined Uranium Monitoring, Regular Resolved
October 1, 2008 Combined Uranium Monitoring, Regular Resolved
October 1, 2008 Combined Uranium Monitoring, Regular Resolved
October 1, 2008 Combined Uranium Monitoring, Regular Resolved
October 1, 2008 Radium-226 Monitoring, Regular Resolved
October 1, 2008 Combined Uranium Monitoring, Regular Resolved
October 1, 2008 Radium-226 Monitoring, Regular Resolved
October 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2008 Combined Uranium Monitoring, Regular Resolved
July 1, 2008 Combined Uranium Monitoring, Regular Resolved
July 1, 2008 Combined Uranium Monitoring, Regular Resolved
July 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2008 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2008 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2008 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2008 Combined Uranium Monitoring, Regular Resolved
July 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2008 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2008 Combined Uranium Monitoring, Regular Resolved
July 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2008 Radium-226 Monitoring, Regular Resolved
July 1, 2008 Radium-226 Monitoring, Regular Resolved
July 1, 2008 Radium-226 Monitoring, Regular Resolved
July 1, 2008 Radium-226 Monitoring, Regular Resolved
July 1, 2008 Radium-226 Monitoring, Regular Resolved
July 1, 2008 Radium-228 Monitoring, Regular Resolved
July 1, 2008 Radium-228 Monitoring, Regular Resolved
July 1, 2008 Radium-228 Monitoring, Regular Resolved
July 1, 2008 Radium-228 Monitoring, Regular Resolved
July 1, 2008 Radium-228 Monitoring, Regular Resolved
April 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2008 Combined Uranium Monitoring, Regular Resolved
April 1, 2008 Combined Uranium Monitoring, Regular Resolved
April 1, 2008 Combined Uranium Monitoring, Regular Resolved
April 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2008 Radium-226 Monitoring, Regular Resolved
April 1, 2008 Radium-226 Monitoring, Regular Resolved
April 1, 2008 Radium-226 Monitoring, Regular Resolved
April 1, 2008 Radium-228 Monitoring, Regular Resolved
April 1, 2008 Radium-228 Monitoring, Regular Resolved
April 1, 2008 Radium-228 Monitoring, Regular Resolved
April 1, 2008 Radium-226 Monitoring, Regular Resolved
April 1, 2008 Radium-228 Monitoring, Regular Resolved
April 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2008 Combined Uranium Monitoring, Regular Resolved
April 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2008 Combined Uranium Monitoring, Regular Resolved
April 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2008 Radium-226 Monitoring, Regular Resolved
April 1, 2008 Radium-228 Monitoring, Regular Resolved
March 21, 2008 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 21, 2008 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2008 Combined Uranium Monitoring, Regular Resolved
January 1, 2008 Combined Uranium Monitoring, Regular Resolved
January 1, 2008 Combined Uranium Monitoring, Regular Resolved
January 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2008 Radium-228 Monitoring, Regular Resolved
January 1, 2008 Radium-228 Monitoring, Regular Resolved
January 1, 2008 Radium-228 Monitoring, Regular Resolved
January 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2008 Combined Uranium Monitoring, Regular Resolved
January 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2008 Radium-228 Monitoring, Regular Resolved
January 1, 2008 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2008 Combined Uranium Monitoring, Regular Resolved
January 1, 2008 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2008 Radium-228 Monitoring, Regular Resolved
January 1, 2008 Radium-226 Monitoring, Regular Resolved
January 1, 2008 Radium-226 Monitoring, Regular Resolved
January 1, 2008 Radium-226 Monitoring, Regular Resolved
January 1, 2008 Radium-226 Monitoring, Regular Resolved
January 1, 2008 Radium-226 Monitoring, Regular Resolved
October 1, 2007 Consumer Confidence Rule Consumer Confidence Report Inadequate Reporting Resolved
October 1, 2007 Consumer Confidence Rule Consumer Confidence Report Inadequate Reporting Resolved
October 1, 2007 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2007 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2007 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2007 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2007 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
July 22, 2007 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 22, 2007 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 21, 2007 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 1, 2007 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2007 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2006 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2006 Consumer Confidence Rule Consumer Confidence Report Inadequate Reporting Resolved
January 1, 2006 Nitrate Monitoring, Regular Resolved
January 1, 2006 Nitrate Monitoring, Regular Resolved
January 1, 2006 Nitrate Monitoring, Regular Resolved
November 20, 2005 Public Notice Public Notification Violation without NPDWR Violation Resolved
November 20, 2005 Public Notice Public Notification Violation without NPDWR Violation Resolved
October 1, 2005 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2005 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2005 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2005 Consumer Confidence Rule Consumer Confidence Report Inadequate Reporting Resolved
October 1, 2005 Consumer Confidence Rule Consumer Confidence Report Inadequate Reporting Resolved
October 1, 2005 Consumer Confidence Rule Consumer Confidence Report Inadequate Reporting Resolved
August 1, 2005 Coliform (Tcr) Monitoring, Routine Minor (TCR) Resolved
August 1, 2005 Coliform (Tcr) Monitoring, Routine Minor (TCR) Resolved
August 1, 2005 Coliform (Tcr) Monitoring, Routine Minor (TCR) Resolved
August 1, 2005 Coliform (Tcr) Monitoring, Routine Minor (TCR) Resolved
July 10, 2005 Public Notice Public Notification Violation without NPDWR Violation Resolved
July 10, 2005 Public Notice Public Notification Violation without NPDWR Violation Resolved
July 1, 2005 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2005 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
April 2, 2005 Public Notice Public Notification Violation without NPDWR Violation Resolved
April 2, 2005 Public Notice Public Notification Violation without NPDWR Violation Resolved
January 23, 2005 Public Notice Public Notification Violation without NPDWR Violation Resolved
January 23, 2005 Public Notice Public Notification Violation without NPDWR Violation Resolved
January 1, 2005 Nitrate Monitoring, Regular Resolved
January 1, 2005 Nitrate Monitoring, Regular Resolved
January 1, 2005 Nitrate Monitoring, Regular Resolved
September 1, 2004 Coliform (Tcr) Monitoring, Repeat Major (TCR) Resolved
September 1, 2004 Coliform (Tcr) Monitoring, Repeat Major (TCR) Resolved
September 1, 2004 Coliform (Tcr) Monitoring, Repeat Major (TCR) Resolved
July 1, 2004 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2004 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2004 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2004 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
May 1, 2004 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
May 1, 2004 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
May 1, 2004 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
April 26, 2004 Public Notice Public Notification Violation without NPDWR Violation Resolved
April 26, 2004 Public Notice Public Notification Violation without NPDWR Violation Resolved
November 1, 2003 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
November 1, 2003 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
November 1, 2003 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
July 1, 2003 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2003 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2003 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2003 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2003 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2003 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
January 1, 2003 Nitrite Monitoring, Regular Resolved
January 1, 2003 Nitrite Monitoring, Regular Resolved
January 1, 2003 Nitrite Monitoring, Regular Resolved
July 1, 2002 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2002 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2002 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2002 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2002 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2002 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
January 1, 2002 Nitrite Monitoring, Regular Resolved
January 1, 2002 Nitrite Monitoring, Regular Resolved
January 1, 2002 Nitrite Monitoring, Regular Resolved
July 1, 2001 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2001 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2001 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2001 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2001 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2001 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
September 1, 2000 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
September 1, 2000 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
September 1, 2000 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
June 1, 2000 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
June 1, 2000 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
June 1, 2000 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
May 1, 2000 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
May 1, 2000 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
May 1, 2000 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
March 1, 2000 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
March 1, 2000 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
March 1, 2000 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
January 1, 2000 Nitrate Monitoring, Regular Resolved
January 1, 2000 Nitrate Monitoring, Regular Resolved
January 1, 2000 Nitrate Monitoring, Regular Resolved
January 1, 2000 Nitrite Monitoring, Regular Resolved
January 1, 2000 Nitrite Monitoring, Regular Resolved
January 1, 2000 Nitrite Monitoring, Regular Resolved
October 19, 1999 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
October 19, 1999 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
October 19, 1999 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
October 19, 1999 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
September 1, 1999 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
September 1, 1999 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
September 1, 1999 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
January 1, 1999 Nitrate Monitoring, Regular Resolved
January 1, 1999 Nitrate Monitoring, Regular Resolved
January 1, 1999 Nitrate Monitoring, Regular Resolved
January 1, 1999 Nitrite Monitoring, Regular Resolved
January 1, 1999 Nitrite Monitoring, Regular Resolved
January 1, 1999 Nitrite Monitoring, Regular Resolved
August 1, 1997 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
April 1, 1996 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
April 1, 1996 Coliform (Tcr) Monitoring, Routine Major (TCR) Resolved
January 1, 1996 Nitrate Monitoring, Regular Resolved
January 1, 1996 Nitrate Monitoring, Regular Resolved
January 1, 1996 Nitrate Monitoring, Regular Resolved
January 1, 1996 Nitrate Monitoring, Regular Resolved
January 1, 1996 Nitrate Monitoring, Regular Resolved
January 1, 1995 Nitrate Monitoring, Regular Resolved
January 1, 1995 Nitrate Monitoring, Regular Resolved
January 1, 1995 Nitrate Monitoring, Regular Resolved
January 1, 1995 Nitrate Monitoring, Regular Resolved
January 1, 1995 Nitrate Monitoring, Regular Resolved
July 1, 1993 Lead and Copper Rule Initial Tap Sampling for Pb and Cu Resolved
July 1, 1993 Lead and Copper Rule Initial Tap Sampling for Pb and Cu Resolved
July 1, 1993 Lead and Copper Rule Initial Tap Sampling for Pb and Cu Resolved
July 1, 1993 Lead and Copper Rule Initial Tap Sampling for Pb and Cu Resolved
July 1, 1993 Lead and Copper Rule Initial Tap Sampling for Pb and Cu Resolved
July 1, 1993 Lead and Copper Rule Initial Tap Sampling for Pb and Cu Resolved
July 1, 1993 Lead and Copper Rule Initial Tap Sampling for Pb and Cu Resolved
July 1, 1993 Lead and Copper Rule Initial Tap Sampling for Pb and Cu Resolved
January 1, 1993 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 1993 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 1992 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
July 1, 1992 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
July 1, 1992 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
July 1, 1992 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
July 1, 1992 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
January 1, 1992 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
January 1, 1992 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
January 1, 1992 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
January 1, 1992 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
January 1, 1992 Coliform (Tcr) Maximum Contaminant Level Violation, Monthly (TCR) Resolved
November 1, 1991 Coliform (Tcr) Maximum Contaminant Level Violation, Acute (TCR) Resolved
November 1, 1991 Coliform (Tcr) Maximum Contaminant Level Violation, Acute (TCR) Resolved
November 1, 1991 Coliform (Tcr) Maximum Contaminant Level Violation, Acute (TCR) Resolved
November 1, 1991 Coliform (Tcr) Maximum Contaminant Level Violation, Acute (TCR) Resolved
November 1, 1991 Coliform (Tcr) Maximum Contaminant Level Violation, Acute (TCR) Resolved
November 1, 1991 Coliform (Tcr) Maximum Contaminant Level Violation, Acute (TCR) Resolved
November 1, 1991 Coliform (Tcr) Maximum Contaminant Level Violation, Acute (TCR) Resolved
November 1, 1991 Coliform (Tcr) Maximum Contaminant Level Violation, Acute (TCR) Resolved
October 1, 1980 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 1980 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 1980 Gross Beta Particle Activity Monitoring, Regular Resolved
October 1, 1980 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 1980 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 1980 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved

Where to see every contaminant this utility tested for

EPA's bulk SDWIS dataset gives MyTapWater.us per-system measured values for lead and copper, plus violation records for everything else. To see every regulated contaminant this utility tested for in the past year (TTHMs, HAA5, nitrate, arsenic, fluoride, chromium, etc.) with measured values, read the utility's Consumer Confidence Report (CCR).

Every community water system is required by EPA to publish a CCR annually, by July 1, listing every contaminant they sampled, the measured value, the federal limit, and any health-based exceedances. Most utilities post the report online; some mail it with your bill.

How to find KIRBY`S MHP's CCR:

  • Search "KIRBY`S MHP consumer confidence report" in your browser. The PDF is usually on the utility's own website.
  • Or check EPA's CCR finder for NC0201118 (some utilities upload theirs to EPA, some do not).
  • Or call the utility directly. Their phone number is in the contact section below.

Contact this utility

Public administrative contact information for this water system, as filed with the EPA. Use this to ask about your service line, request your home's lead status, or report a water quality issue.

Administrator
KIRBY, CINDIE (KIRBY, CINDIE)
Email
cindiekirby1126@gmail.com
Mailing address
3973 DICKEY MILL RD
MEBANE, NC, 27302