Skip to main content
MyTapWater.us

PWSID TX1890018

SHAFTER MINE

Community water system based in Marfa, TX

Service area on file with EPA: Presidio County. EPA's recorded service area can be incomplete for regional authorities. The cities and counties above are what the utility has filed with EPA; the utility may serve additional areas.

Population served
32
Source
Groundwater
Status
Active

At a glance

2 issues above the federal safety limit

No recent lead, copper, or PFAS test data on file from this system. Most other contaminants are tracked through violation reports rather than per-page test tables.

Risk classification follows EPA's published values for safe drinking water, with caution and concern bands reviewed by a clinician. Past resolved violations do not influence this card. See methodology.

Lead service line inventory

No inventory data on file

We do not yet have this utility's published Lead Service Line Inventory on file. The EPA Lead and Copper Rule Improvements (LCRI) required every community water system to publish one by October 16, 2024 and to identify and replace any lead lines within 10 years. How lead enters drinking water.

Phase 1 coverage focuses on the largest NC utilities. Smaller systems will be added; in the meantime, ask your utility for their inventory or check their Consumer Confidence Report.

Lead and copper test results

The most recent measurement per contaminant from EPA's Lead and Copper Rule sampling.

Why only lead and copper, and not arsenic, nitrate, or others?

EPA's bulk SDWIS download is the only nationwide per-system sample data they publish, and it only includes the Lead and Copper Rule table. Values for other regulated contaminants (TTHMs, nitrate, arsenic, etc.) appear on this page only when they trigger a violation. For the full per-system contaminant suite, see the utility's annual Consumer Confidence Report (link further down the page).

No recent Lead and Copper sample data

EPA's national SDWIS bulk dataset does not include Lead and Copper Rule sampling rows for this system in the most recent release. That can mean the system is small enough to be on a reduced sampling schedule, or that recent samples have not yet been submitted to EPA. Check the system's annual Consumer Confidence Report (see below) for the most recent local measurements.

Data from EPA SDWIS (Lead and Copper Rule sample table) , last refreshed May 24, 2026.

Fluoride

We don't yet have this utility's specific fluoridation status from CDC's My Water's Fluoride listing. The figures below describe the broader area, not SHAFTER MINE itself.

Area context

Presidio County, TX (2020 data)

Community water systems
7 of 7 add fluoride
Population on fluoridated water
7,334 of 7,334 (100.0%)

Texas statewide (2020 data)

Population on fluoridated water
19,743,163 of 27,818,869 (71.0%)
Community water systems adding fluoride
2,573 of 6,046

Look up your specific utility

Texas shares per-system data on CDC's My Water's Fluoride site. Search by water system to see whether SHAFTER MINE adds fluoride.

CDC My Water's Fluoride: search by water system

Data from CDC Water Fluoridation Reporting System (state and county aggregates) , last refreshed May 16, 2026.

Compliance history

EPA-recorded violations against this system over the last 5 years.

How to read this section

Health-based violations are when a measured limit was exceeded; the measured concentration is shown alongside the EPA federal limit where SDWIS published it. Monitoring and reporting items are paperwork issues (missed sample dates, late filings) that do not themselves indicate unsafe water.

2 active health-based violations

EPA records 2 health-based violations that have not yet been resolved.

Health-based violations in the last 5 years
Period start Contaminant What happened Measured level Status
October 17, 2024 Lead and Copper Rule Revisions LSL Inventory Not reported Unaddressed
October 17, 2024 Lead and Copper Rule Revisions LSL Inventory Not reported Unaddressed
305 monitoring and reporting item s (paperwork) , 17 still open · these are not health risks
Monitoring and reporting items in the last 5 years
Period start Relates to Item Status
December 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 18, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
August 3, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
August 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2025 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
July 1, 2025 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
July 1, 2025 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Unaddressed
July 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 8, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
May 8, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
May 1, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
May 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2025 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
January 1, 2025 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
January 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 11, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
December 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Unaddressed
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Unaddressed
October 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2024 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
July 1, 2024 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
June 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2024 Nitrate Monitoring, Regular Resolved
January 1, 2024 Nitrate Monitoring, Regular Resolved
January 1, 2024 Nitrate Monitoring, Regular Resolved
January 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2023 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
October 1, 2023 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
September 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2023 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2023 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
June 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2023 Nitrate Monitoring, Regular Resolved
January 1, 2023 Nitrate Monitoring, Regular Resolved
January 1, 2023 Nitrate Monitoring, Regular Resolved
January 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2022 1,2-Dibromo-3-Chloropropane Monitoring, Regular Resolved
January 1, 2022 1,2-Dibromo-3-Chloropropane Monitoring, Regular Resolved
January 1, 2022 Ethylene Dibromide Monitoring, Regular Resolved
January 1, 2022 Ethylene Dibromide Monitoring, Regular Resolved
January 1, 2022 Bhc-Gamma Monitoring, Regular Resolved
January 1, 2022 Bhc-Gamma Monitoring, Regular Resolved
January 1, 2022 Toxaphene Monitoring, Regular Resolved
January 1, 2022 Toxaphene Monitoring, Regular Resolved
January 1, 2022 Simazine Monitoring, Regular Resolved
January 1, 2022 Simazine Monitoring, Regular Resolved
January 1, 2022 Hexachlorocyclopentadiene Monitoring, Regular Resolved
January 1, 2022 Hexachlorocyclopentadiene Monitoring, Regular Resolved
January 1, 2022 Atrazine Monitoring, Regular Resolved
January 1, 2022 Atrazine Monitoring, Regular Resolved
January 1, 2022 Lasso Monitoring, Regular Resolved
January 1, 2022 Lasso Monitoring, Regular Resolved
January 1, 2022 Heptachlor Monitoring, Regular Resolved
January 1, 2022 Heptachlor Monitoring, Regular Resolved
January 1, 2022 Heptachlor Epoxide Monitoring, Regular Resolved
January 1, 2022 Heptachlor Epoxide Monitoring, Regular Resolved
January 1, 2022 Pentachlorophenol Monitoring, Regular Resolved
January 1, 2022 Pentachlorophenol Monitoring, Regular Resolved
January 1, 2022 Fluoride Monitoring, Regular Resolved
January 1, 2022 Fluoride Monitoring, Regular Resolved
January 1, 2022 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 Dichloromethane Monitoring, Regular Resolved
January 1, 2022 Dichloromethane Monitoring, Regular Resolved
January 1, 2022 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2022 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2022 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2022 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2022 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2022 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2022 Chlorobenzene Monitoring, Regular Resolved
January 1, 2022 Chlorobenzene Monitoring, Regular Resolved
January 1, 2022 Benzene Monitoring, Regular Resolved
January 1, 2022 Benzene Monitoring, Regular Resolved
January 1, 2022 Toluene Monitoring, Regular Resolved
January 1, 2022 Toluene Monitoring, Regular Resolved
January 1, 2022 Ethylbenzene Monitoring, Regular Resolved
January 1, 2022 Ethylbenzene Monitoring, Regular Resolved
January 1, 2022 Styrene Monitoring, Regular Resolved
January 1, 2022 Styrene Monitoring, Regular Resolved
January 1, 2022 Picloram Monitoring, Regular Resolved
January 1, 2022 Picloram Monitoring, Regular Resolved
January 1, 2022 Dinoseb Monitoring, Regular Resolved
January 1, 2022 Dinoseb Monitoring, Regular Resolved
January 1, 2022 2,4,5-Tp Monitoring, Regular Resolved
January 1, 2022 2,4,5-Tp Monitoring, Regular Resolved
January 1, 2022 Tthm Monitoring and Reporting (DBP) Resolved
January 1, 2022 Tthm Monitoring and Reporting (DBP) Resolved
January 1, 2022 Selenium Monitoring, Regular Resolved
January 1, 2022 Selenium Monitoring, Regular Resolved
January 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2022 Arsenic Monitoring, Regular Resolved
January 1, 2022 Barium Monitoring, Regular Resolved
January 1, 2022 Barium Monitoring, Regular Resolved
January 1, 2022 Chromium Monitoring, Regular Resolved
January 1, 2022 Chromium Monitoring, Regular Resolved
January 1, 2022 Mercury Monitoring, Regular Resolved
January 1, 2022 Mercury Monitoring, Regular Resolved
January 1, 2022 Carbofuran Monitoring, Regular Resolved
January 1, 2022 Carbofuran Monitoring, Regular Resolved
January 1, 2022 Arsenic Monitoring, Regular Resolved
January 1, 2022 Hexachlorobenzene Monitoring, Regular Resolved
January 1, 2022 Hexachlorobenzene Monitoring, Regular Resolved
January 1, 2022 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2022 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2022 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2022 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2022 Dalapon Monitoring, Regular Resolved
January 1, 2022 Dalapon Monitoring, Regular Resolved
January 1, 2022 Thallium, Total Monitoring, Regular Resolved
January 1, 2022 Thallium, Total Monitoring, Regular Resolved
January 1, 2022 Antimony, Total Monitoring, Regular Resolved
January 1, 2022 Antimony, Total Monitoring, Regular Resolved
January 1, 2022 Trichloroethylene Monitoring, Regular Resolved
January 1, 2022 Trichloroethylene Monitoring, Regular Resolved
January 1, 2022 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2022 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2022 Benzo(a)Pyrene Monitoring, Regular Resolved
January 1, 2022 Benzo(a)Pyrene Monitoring, Regular Resolved
January 1, 2022 Endrin Monitoring, Regular Resolved
January 1, 2022 Endrin Monitoring, Regular Resolved
January 1, 2022 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2022 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2022 Chlordane Monitoring, Regular Resolved
January 1, 2022 Chlordane Monitoring, Regular Resolved
January 1, 2022 Xylenes, Total Monitoring, Regular Resolved
January 1, 2022 Xylenes, Total Monitoring, Regular Resolved
January 1, 2022 Di(2-Ethylhexyl) Phthalate Monitoring, Regular Resolved
January 1, 2022 Di(2-Ethylhexyl) Phthalate Monitoring, Regular Resolved
January 1, 2022 Beryllium, Total Monitoring, Regular Resolved
January 1, 2022 Beryllium, Total Monitoring, Regular Resolved
January 1, 2022 Aldicarb Monitoring, Regular Resolved
January 1, 2022 Aldicarb Monitoring, Regular Resolved
January 1, 2022 Di(2-Ethylhexyl) Adipate Monitoring, Regular Resolved
January 1, 2022 Di(2-Ethylhexyl) Adipate Monitoring, Regular Resolved
January 1, 2022 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
January 1, 2022 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
January 1, 2022 Aldicarb Sulfoxide Monitoring, Regular Resolved
January 1, 2022 Aldicarb Sulfoxide Monitoring, Regular Resolved
January 1, 2022 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2022 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2022 Methoxychlor Monitoring, Regular Resolved
January 1, 2022 Methoxychlor Monitoring, Regular Resolved
January 1, 2022 2,4-D Monitoring, Regular Resolved
January 1, 2022 2,4-D Monitoring, Regular Resolved
January 1, 2022 Cadmium Monitoring, Regular Resolved
January 1, 2022 Cadmium Monitoring, Regular Resolved
January 1, 2022 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2022 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2022 Oxamyl Monitoring, Regular Resolved
January 1, 2022 Oxamyl Monitoring, Regular Resolved
January 1, 2022 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2022 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2022 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 Aldicarb Sulfone Monitoring, Regular Resolved
January 1, 2022 Aldicarb Sulfone Monitoring, Regular Resolved
December 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
12 older violation s (5-10 years ago) · all paperwork (monitoring/reporting), none health-based , all resolved
Violations 5-10 years ago (12 total)
Period start Relates to Item Measured level Status
January 1, 2021 Combined Uranium Monitoring, Regular Resolved
January 1, 2021 Combined Uranium Monitoring, Regular Resolved
January 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2021 Cyanide Monitoring, Regular Resolved
January 1, 2021 Cyanide Monitoring, Regular Resolved
January 6, 2020 E. Coli Monitoring, Source Water (GWR) Resolved
January 6, 2020 E. Coli Monitoring, Source Water (GWR) Resolved
January 6, 2020 E. Coli Monitoring, Source Water (GWR) Resolved
January 6, 2020 E. Coli Monitoring, Source Water (GWR) Resolved

Data from EPA SDWIS (violation records) , last refreshed May 24, 2026.

Where to see every contaminant this utility tested for

EPA's bulk SDWIS dataset gives MyTapWater.us per-system measured values for lead and copper, plus violation records for everything else. To see every regulated contaminant this utility tested for in the past year (TTHMs, HAA5, nitrate, arsenic, fluoride, chromium, etc.) with measured values, read the utility's Consumer Confidence Report (CCR).

Every community water system is required by EPA to publish a CCR annually, by July 1, listing every contaminant they sampled, the measured value, the federal limit, and any health-based exceedances. Most utilities post the report online; some mail it with your bill.

How to find SHAFTER MINE's CCR:

Compare nearby utilities by population served.

Contact this utility

Public administrative contact information for this water system, as filed with the EPA. Use this to ask about your service line, request your home's lead status, or report a water quality issue.

Administrator
DROVER, KEVIN
Phone
866-532-9333 x200
Mailing address
97423 US HIGHWAY 67
MARFA, TX 79843-6541

Where this page's data comes from

Bundle released 2026-Q2, regenerated May 24, 2026. Each section above also shows its own source date so you can tell at a glance how fresh that part of the page is.

Every value on this page is cross-verified before publication; read our methodology for the verification steps and corrections process.