Skip to main content
MyTapWater.us

PWSID TX0200779

MARQUIS CONSTRUCTION YARD

Non-transient non-community based in Lake Jackson, TX

Service area on file with EPA: Brazoria County. EPA's recorded service area can be incomplete for regional authorities. The cities and counties above are what the utility has filed with EPA; the utility may serve additional areas.

Population served
40
Source
Groundwater
Status
Active

At a glance

1 finding worth watching

Past 5 years: 4 health-based violations on file, all marked Resolved or Archived. See compliance history below.

Risk classification follows EPA's published values for safe drinking water, with caution and concern bands reviewed by a clinician. Past resolved violations do not influence this card. See methodology.

Lead service line inventory

Utility reports no confirmed lead service lines

MARQUIS CONSTRUCTION YARD reports 0 confirmed lead service lines, 5 non-lead, 0 unknown (total 5) in the EPA SDWIS service line inventory (2026Q1).

  • 0 confirmed lead service lines
  • 0 galvanized requiring replacement (LCRI treats these as lead)
  • 0 unknown (0.0% of total)
  • 5 confirmed non-lead (100.0%)
  • 5 total service lines in the system
What to do if your service line might be lead
  1. Ask your utility to check the service-line classification for your specific address. Many utilities provide a public address-lookup tool linked from the inventory page.
  2. Get on the replacement queue. Under the LCRI, utilities must replace all lead and galvanized-requiring- replacement lines within 10 years (clock generally starts November 2027). Some prioritize requests.
  3. Until the line is replaced: flush the tap 30 seconds after long stagnation, use cold water for drinking and cooking, and consider an NSF/ANSI 53 lead-rated tap filter.
  4. Talk to your clinician about a blood lead test for anyone in the home, especially a pregnant person or a child under 6. Lead in drinking water guide.

Inventory data sourced from MARQUIS CONSTRUCTION YARD ( retrieved May 24, 2026 ; curator confidence: high ). Confirmed against the original source automatically each month; see methodology.

Lead and copper test results

The most recent measurement per contaminant from EPA's Lead and Copper Rule sampling.

Why only lead and copper, and not arsenic, nitrate, or others?

EPA's bulk SDWIS download is the only nationwide per-system sample data they publish, and it only includes the Lead and Copper Rule table. Values for other regulated contaminants (TTHMs, nitrate, arsenic, etc.) appear on this page only when they trigger a violation. For the full per-system contaminant suite, see the utility's annual Consumer Confidence Report (link further down the page).

Most recent measurements per contaminant (Lead and Copper Rule) . Sorted by risk: concern first, then caution, then unrated, then safe.
Contaminant Most recent Date Risk
PB90
0.00289 mg/L December 31, 2025 Caution

Data from EPA SDWIS (Lead and Copper Rule sample table) , last refreshed May 24, 2026.

Fluoride

We don't yet have this utility's specific fluoridation status from CDC's My Water's Fluoride listing. The figures below describe the broader area, not MARQUIS CONSTRUCTION YARD itself.

Area context

Brazoria County, TX (2020 data)

Community water systems
123 of 176 add fluoride
Population on fluoridated water
255,329 of 329,960 (77.4%)

Texas statewide (2020 data)

Population on fluoridated water
19,743,163 of 27,818,869 (71.0%)
Community water systems adding fluoride
2,573 of 6,046

Look up your specific utility

Texas shares per-system data on CDC's My Water's Fluoride site. Search by water system to see whether MARQUIS CONSTRUCTION YARD adds fluoride.

CDC My Water's Fluoride: search by water system

Data from CDC Water Fluoridation Reporting System (state and county aggregates) , last refreshed May 16, 2026.

Compliance history

EPA-recorded violations against this system over the last 5 years.

How to read this section

Health-based violations are when a measured limit was exceeded; the measured concentration is shown alongside the EPA federal limit where SDWIS published it. Monitoring and reporting items are paperwork issues (missed sample dates, late filings) that do not themselves indicate unsafe water.

4 resolved health-based violations in the last 5 years

All 4 health-based violations in the last 5 years are marked Resolved or Archived. Past violations do not represent current water quality.

Health-based violations in the last 5 years
Period start Contaminant What happened Measured level Status
October 17, 2024 Lead and Copper Rule Revisions LSL Inventory Not reported Resolved
October 17, 2024 Lead and Copper Rule Revisions LSL Inventory Not reported Resolved
October 17, 2024 Lead and Copper Rule Revisions LSL Inventory Not reported Resolved
October 17, 2024 Lead and Copper Rule Revisions LSL Inventory Not reported Resolved
92 monitoring and reporting item s (paperwork) , 1 still open · these are not health risks
Monitoring and reporting items in the last 5 years
Period start Relates to Item Status
September 29, 2025 Lead and Copper Rule Lead Consumer Notice Unaddressed
May 1, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
May 1, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 1, 2025 Lead and Copper Rule Lead Consumer Notice Resolved
April 1, 2025 Lead and Copper Rule Lead Consumer Notice Resolved
March 6, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 6, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 6, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 6, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Resolved
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Resolved
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Resolved
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Resolved
July 1, 2024 Chlordane Monitoring, Regular Resolved
July 1, 2024 Chlordane Monitoring, Regular Resolved
July 1, 2024 Chlordane Monitoring, Regular Resolved
July 1, 2024 Chlordane Monitoring, Regular Resolved
July 1, 2024 Endrin Monitoring, Regular Resolved
July 1, 2024 Endrin Monitoring, Regular Resolved
July 1, 2024 Endrin Monitoring, Regular Resolved
July 1, 2024 Bhc-Gamma Monitoring, Regular Resolved
July 1, 2024 Bhc-Gamma Monitoring, Regular Resolved
July 1, 2024 Bhc-Gamma Monitoring, Regular Resolved
July 1, 2024 Bhc-Gamma Monitoring, Regular Resolved
July 1, 2024 Methoxychlor Monitoring, Regular Resolved
July 1, 2024 Methoxychlor Monitoring, Regular Resolved
July 1, 2024 Methoxychlor Monitoring, Regular Resolved
July 1, 2024 Methoxychlor Monitoring, Regular Resolved
July 1, 2024 Toxaphene Monitoring, Regular Resolved
July 1, 2024 Toxaphene Monitoring, Regular Resolved
July 1, 2024 Toxaphene Monitoring, Regular Resolved
July 1, 2024 Toxaphene Monitoring, Regular Resolved
July 1, 2024 Simazine Monitoring, Regular Resolved
July 1, 2024 Simazine Monitoring, Regular Resolved
July 1, 2024 Simazine Monitoring, Regular Resolved
July 1, 2024 Simazine Monitoring, Regular Resolved
July 1, 2024 Di(2-Ethylhexyl) Phthalate Monitoring, Regular Resolved
July 1, 2024 Di(2-Ethylhexyl) Phthalate Monitoring, Regular Resolved
July 1, 2024 Di(2-Ethylhexyl) Phthalate Monitoring, Regular Resolved
July 1, 2024 Di(2-Ethylhexyl) Phthalate Monitoring, Regular Resolved
July 1, 2024 Hexachlorocyclopentadiene Monitoring, Regular Resolved
July 1, 2024 Hexachlorocyclopentadiene Monitoring, Regular Resolved
July 1, 2024 Hexachlorocyclopentadiene Monitoring, Regular Resolved
July 1, 2024 Hexachlorocyclopentadiene Monitoring, Regular Resolved
July 1, 2024 Lasso Monitoring, Regular Resolved
July 1, 2024 Lasso Monitoring, Regular Resolved
July 1, 2024 Lasso Monitoring, Regular Resolved
July 1, 2024 Lasso Monitoring, Regular Resolved
July 1, 2024 Lead and Copper Rule Initial Tap Sampling for Pb and Cu Resolved
July 1, 2024 Lead and Copper Rule Initial Tap Sampling for Pb and Cu Resolved
July 1, 2024 Lead and Copper Rule Initial Tap Sampling for Pb and Cu Resolved
July 1, 2024 Lead and Copper Rule Initial Tap Sampling for Pb and Cu Resolved
July 1, 2024 Endrin Monitoring, Regular Resolved
July 1, 2024 Heptachlor Epoxide Monitoring, Regular Resolved
July 1, 2024 Heptachlor Epoxide Monitoring, Regular Resolved
July 1, 2024 Heptachlor Epoxide Monitoring, Regular Resolved
July 1, 2024 Heptachlor Epoxide Monitoring, Regular Resolved
July 1, 2024 Benzo(a)Pyrene Monitoring, Regular Resolved
July 1, 2024 Benzo(a)Pyrene Monitoring, Regular Resolved
July 1, 2024 Benzo(a)Pyrene Monitoring, Regular Resolved
July 1, 2024 Benzo(a)Pyrene Monitoring, Regular Resolved
July 1, 2024 Hexachlorobenzene Monitoring, Regular Resolved
July 1, 2024 Hexachlorobenzene Monitoring, Regular Resolved
July 1, 2024 Hexachlorobenzene Monitoring, Regular Resolved
July 1, 2024 Hexachlorobenzene Monitoring, Regular Resolved
July 1, 2024 Pentachlorophenol Monitoring, Regular Resolved
July 1, 2024 Pentachlorophenol Monitoring, Regular Resolved
July 1, 2024 Pentachlorophenol Monitoring, Regular Resolved
July 1, 2024 Pentachlorophenol Monitoring, Regular Resolved
July 1, 2024 Atrazine Monitoring, Regular Resolved
July 1, 2024 Atrazine Monitoring, Regular Resolved
July 1, 2024 Atrazine Monitoring, Regular Resolved
July 1, 2024 Atrazine Monitoring, Regular Resolved
July 1, 2024 Heptachlor Monitoring, Regular Resolved
July 1, 2024 Heptachlor Monitoring, Regular Resolved
July 1, 2024 Heptachlor Monitoring, Regular Resolved
July 1, 2024 Heptachlor Monitoring, Regular Resolved
July 1, 2024 Di(2-Ethylhexyl) Adipate Monitoring, Regular Resolved
July 1, 2024 Di(2-Ethylhexyl) Adipate Monitoring, Regular Resolved
July 1, 2024 Di(2-Ethylhexyl) Adipate Monitoring, Regular Resolved
July 1, 2024 Di(2-Ethylhexyl) Adipate Monitoring, Regular Resolved
January 1, 2024 Lead and Copper Rule Water Quality Parameter M/R Resolved
January 1, 2024 Lead and Copper Rule Water Quality Parameter M/R Resolved
January 1, 2024 Lead and Copper Rule Water Quality Parameter M/R Resolved
January 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved

Data from EPA SDWIS (violation records) , last refreshed May 24, 2026.

Where to see every contaminant this utility tested for

EPA's bulk SDWIS dataset gives MyTapWater.us per-system measured values for lead and copper, plus violation records for everything else. To see every regulated contaminant this utility tested for in the past year (TTHMs, HAA5, nitrate, arsenic, fluoride, chromium, etc.) with measured values, read the utility's Consumer Confidence Report (CCR).

Every community water system is required by EPA to publish a CCR annually, by July 1, listing every contaminant they sampled, the measured value, the federal limit, and any health-based exceedances. Most utilities post the report online; some mail it with your bill.

How to find MARQUIS CONSTRUCTION YARD's CCR:

Compare nearby utilities by population served.

Contact this utility

Public administrative contact information for this water system, as filed with the EPA. Use this to ask about your service line, request your home's lead status, or report a water quality issue.

Administrator
LEDBETTER, ROY
Phone
979-824-4494
Mailing address
58 ROSE BAY CT
LAKE JACKSON, TX 77566-4458

Where this page's data comes from

Bundle released 2026-Q2, regenerated May 24, 2026. Each section above also shows its own source date so you can tell at a glance how fresh that part of the page is.

Every value on this page is cross-verified before publication; read our methodology for the verification steps and corrections process.