Skip to main content
MyTapWater.us

PWSID TX0150486

NICO TYME WATER COOP

Community water system based in Elmendorf, TX

Service area on file with EPA: Bexar County. EPA's recorded service area can be incomplete for regional authorities. The cities and counties above are what the utility has filed with EPA; the utility may serve additional areas.

Population served
96
Source
Groundwater
Status
Active

At a glance

2 issues above the federal safety limit

No recent lead, copper, or PFAS test data on file from this system. Most other contaminants are tracked through violation reports rather than per-page test tables.

Risk classification follows EPA's published values for safe drinking water, with caution and concern bands reviewed by a clinician. Past resolved violations do not influence this card. See methodology.

Lead service line inventory

No inventory data on file

We do not yet have this utility's published Lead Service Line Inventory on file. The EPA Lead and Copper Rule Improvements (LCRI) required every community water system to publish one by October 16, 2024 and to identify and replace any lead lines within 10 years. How lead enters drinking water.

Phase 1 coverage focuses on the largest NC utilities. Smaller systems will be added; in the meantime, ask your utility for their inventory or check their Consumer Confidence Report.

Lead and copper test results

The most recent measurement per contaminant from EPA's Lead and Copper Rule sampling.

Why only lead and copper, and not arsenic, nitrate, or others?

EPA's bulk SDWIS download is the only nationwide per-system sample data they publish, and it only includes the Lead and Copper Rule table. Values for other regulated contaminants (TTHMs, nitrate, arsenic, etc.) appear on this page only when they trigger a violation. For the full per-system contaminant suite, see the utility's annual Consumer Confidence Report (link further down the page).

No recent Lead and Copper sample data

EPA's national SDWIS bulk dataset does not include Lead and Copper Rule sampling rows for this system in the most recent release. That can mean the system is small enough to be on a reduced sampling schedule, or that recent samples have not yet been submitted to EPA. Check the system's annual Consumer Confidence Report (see below) for the most recent local measurements.

Data from EPA SDWIS (Lead and Copper Rule sample table) , last refreshed May 24, 2026.

Fluoride

Per CDC My Water's Fluoride

NICO TYME WATER COOP does not add fluoride to its drinking water.

This system has not reported adding fluoride to its water on CDC's My Water's Fluoride listing. Natural fluoride may still be present at trace levels from the source water; the utility's annual water quality report has the latest measured concentration.

Source: CDC My Water's Fluoride, listed under NICO-TYME WATER COOPERATIVE (Bexar County). Verify on CDC's site .

Area context

Bexar County, TX (2020 data)

Community water systems
23 of 75 add fluoride
Population on fluoridated water
2,103,455 of 2,221,979 (94.7%)

Texas statewide (2020 data)

Population on fluoridated water
19,743,163 of 27,818,869 (71.0%)
Community water systems adding fluoride
2,573 of 6,046

Data from CDC My Water's Fluoride (per-system status) , last refreshed May 19, 2026.

Data from CDC Water Fluoridation Reporting System (state and county aggregates) , last refreshed May 16, 2026.

Compliance history

EPA-recorded violations against this system over the last 5 years.

How to read this section

Health-based violations are when a measured limit was exceeded; the measured concentration is shown alongside the EPA federal limit where SDWIS published it. Monitoring and reporting items are paperwork issues (missed sample dates, late filings) that do not themselves indicate unsafe water.

2 active health-based violations

EPA records 2 health-based violations that have not yet been resolved.

Health-based violations in the last 5 years
Period start Contaminant What happened Measured level Status
October 17, 2024 Lead and Copper Rule Revisions LSL Inventory Not reported Unaddressed
October 17, 2024 Lead and Copper Rule Revisions LSL Inventory Not reported Unaddressed
485 monitoring and reporting item s (paperwork) , 95 still open · these are not health risks
Monitoring and reporting items in the last 5 years
Period start Relates to Item Status
December 6, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
December 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 16, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
November 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 11, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
October 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 7, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
September 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 8, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
August 3, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
August 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 3, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
July 1, 2025 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
July 1, 2025 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
July 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2025 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Unaddressed
July 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
June 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 30, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
May 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
April 28, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
April 28, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
April 28, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
April 27, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
April 3, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
April 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 10, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 6, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 6, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
February 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2025 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
January 1, 2025 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
December 1, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
December 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
November 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Unaddressed
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Unaddressed
October 1, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
October 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
September 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 18, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
August 1, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
August 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2024 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
July 1, 2024 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
July 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
July 1, 2024 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Unaddressed
July 1, 2024 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2024 Chlorine Monitoring and Reporting (DBP) Resolved
June 1, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
June 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
April 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 31, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 22, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 22, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 22, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 22, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 22, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 22, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 22, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 22, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 29, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
February 17, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
February 1, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
February 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 5, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
January 1, 2024 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
January 1, 2024 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
January 1, 2024 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2024 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2024 Trichloroethylene Monitoring, Regular Resolved
January 1, 2024 Trichloroethylene Monitoring, Regular Resolved
January 1, 2024 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2024 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2024 Chlorobenzene Monitoring, Regular Resolved
January 1, 2024 Chlorobenzene Monitoring, Regular Resolved
January 1, 2024 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2024 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2024 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 Xylenes, Total Monitoring, Regular Resolved
January 1, 2024 Xylenes, Total Monitoring, Regular Resolved
January 1, 2024 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2024 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2024 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2024 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2024 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2024 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2024 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 Toluene Monitoring, Regular Resolved
January 1, 2024 Toluene Monitoring, Regular Resolved
January 1, 2024 Ethylbenzene Monitoring, Regular Resolved
January 1, 2024 Ethylbenzene Monitoring, Regular Resolved
January 1, 2024 Styrene Monitoring, Regular Resolved
January 1, 2024 Styrene Monitoring, Regular Resolved
January 1, 2024 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2024 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2024 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2024 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2024 Dichloromethane Monitoring, Regular Resolved
January 1, 2024 Dichloromethane Monitoring, Regular Resolved
January 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2024 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2024 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2024 Benzene Monitoring, Regular Resolved
January 1, 2024 Benzene Monitoring, Regular Resolved
January 1, 2024 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2024 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2024 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
January 1, 2024 Nitrate Monitoring, Regular Resolved
January 1, 2024 Nitrate Monitoring, Regular Resolved
December 1, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
December 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
November 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
September 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
August 20, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
August 13, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
August 1, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
August 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
July 1, 2023 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
July 1, 2023 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
July 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2023 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Unaddressed
June 9, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
June 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
May 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
April 1, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
April 1, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 26, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 26, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 26, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 26, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 26, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 26, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 1, 2023 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
March 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2023 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
January 1, 2023 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
January 1, 2023 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
January 1, 2023 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2023 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2023 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2023 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2023 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2023 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2023 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2023 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2023 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2023 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2023 Trichloroethylene Monitoring, Regular Resolved
January 1, 2023 Trichloroethylene Monitoring, Regular Resolved
January 1, 2023 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2023 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2023 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2023 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2023 Chlorobenzene Monitoring, Regular Resolved
January 1, 2023 Chlorobenzene Monitoring, Regular Resolved
January 1, 2023 Benzene Monitoring, Regular Resolved
January 1, 2023 Benzene Monitoring, Regular Resolved
January 1, 2023 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2023 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2023 Xylenes, Total Monitoring, Regular Resolved
January 1, 2023 Xylenes, Total Monitoring, Regular Resolved
January 1, 2023 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2023 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2023 Toluene Monitoring, Regular Resolved
January 1, 2023 Toluene Monitoring, Regular Resolved
January 1, 2023 Styrene Monitoring, Regular Resolved
January 1, 2023 Styrene Monitoring, Regular Resolved
January 1, 2023 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2023 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2023 Ethylbenzene Monitoring, Regular Resolved
January 1, 2023 Ethylbenzene Monitoring, Regular Resolved
January 1, 2023 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2023 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2023 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2023 Dichloromethane Monitoring, Regular Resolved
January 1, 2023 Dichloromethane Monitoring, Regular Resolved
January 1, 2023 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2023 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2023 Nitrate Monitoring, Regular Resolved
January 1, 2023 Nitrate Monitoring, Regular Resolved
January 1, 2023 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2023 P-Dichlorobenzene Monitoring, Regular Resolved
December 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2022 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
July 1, 2022 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
July 1, 2022 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
July 1, 2022 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Unaddressed
July 1, 2022 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Unaddressed
July 1, 2022 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Unaddressed
July 1, 2022 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Unaddressed
June 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
May 1, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 3, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 3, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 2, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 2, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 2, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 2, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 2, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 2, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 2, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 2, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 1, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 1, 2022 Combined Uranium Monitoring, Regular Resolved
April 1, 2022 Combined Uranium Monitoring, Regular Resolved
April 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2022 Combined Uranium Monitoring, Regular Resolved
April 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
March 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 1, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 1, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 30, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 30, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 1, 2022 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
January 1, 2022 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
January 1, 2022 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 Xylenes, Total Monitoring, Regular Resolved
January 1, 2022 Xylenes, Total Monitoring, Regular Resolved
January 1, 2022 Xylenes, Total Monitoring, Regular Resolved
January 1, 2022 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2022 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2022 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2022 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2022 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2022 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2022 Trichloroethylene Monitoring, Regular Resolved
January 1, 2022 Trichloroethylene Monitoring, Regular Resolved
January 1, 2022 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2022 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2022 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2022 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2022 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2022 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2022 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2022 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2022 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2022 Trichloroethylene Monitoring, Regular Resolved
January 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 1, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 1, 2022 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
January 1, 2022 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
January 1, 2022 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2022 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2022 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2022 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2022 Chlorobenzene Monitoring, Regular Resolved
January 1, 2022 Chlorobenzene Monitoring, Regular Resolved
January 1, 2022 Chlorobenzene Monitoring, Regular Resolved
January 1, 2022 Styrene Monitoring, Regular Resolved
January 1, 2022 Styrene Monitoring, Regular Resolved
January 1, 2022 Styrene Monitoring, Regular Resolved
January 1, 2022 Ethylbenzene Monitoring, Regular Resolved
January 1, 2022 Ethylbenzene Monitoring, Regular Resolved
January 1, 2022 Ethylbenzene Monitoring, Regular Resolved
January 1, 2022 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2022 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2022 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2022 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2022 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2022 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2022 Combined Uranium Monitoring, Regular Resolved
January 1, 2022 Combined Uranium Monitoring, Regular Resolved
January 1, 2022 Combined Uranium Monitoring, Regular Resolved
January 1, 2022 Nitrate Monitoring, Regular Resolved
January 1, 2022 Nitrate Monitoring, Regular Resolved
January 1, 2022 Nitrate Monitoring, Regular Resolved
January 1, 2022 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2022 Toluene Monitoring, Regular Resolved
January 1, 2022 Toluene Monitoring, Regular Resolved
January 1, 2022 Toluene Monitoring, Regular Resolved
January 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2022 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2022 Benzene Monitoring, Regular Resolved
January 1, 2022 Benzene Monitoring, Regular Resolved
January 1, 2022 Benzene Monitoring, Regular Resolved
January 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2022 Dichloromethane Monitoring, Regular Resolved
January 1, 2022 Dichloromethane Monitoring, Regular Resolved
January 1, 2022 Dichloromethane Monitoring, Regular Resolved
January 1, 2022 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2022 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2022 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2022 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2022 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2022 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2022 Cyanide Monitoring, Regular Resolved
January 1, 2022 Cyanide Monitoring, Regular Resolved
December 23, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 23, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 19, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 19, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 19, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
November 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
November 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
November 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 2, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 2, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 2, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2021 Combined Uranium Monitoring, Regular Resolved
October 1, 2021 Combined Uranium Monitoring, Regular Resolved
October 1, 2021 Combined Uranium Monitoring, Regular Resolved
September 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
August 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
August 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 4, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 4, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 4, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2021 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 1, 2021 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2021 Combined Uranium Monitoring, Regular Resolved
July 1, 2021 Combined Uranium Monitoring, Regular Resolved
July 1, 2021 Combined Uranium Monitoring, Regular Resolved
July 1, 2021 Combined Uranium Monitoring, Regular Resolved
July 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2021 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
July 1, 2021 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
July 1, 2021 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
July 1, 2021 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
June 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
969 older violation s (5-10 years ago) · 14 health-based, 955 paperwork , 37 still open
Violations 5-10 years ago (969 total)
Period start Relates to Item Measured level Status
May 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 18, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2021 Combined Uranium Monitoring, Regular Resolved
April 1, 2021 Combined Uranium Monitoring, Regular Resolved
April 1, 2021 Combined Uranium Monitoring, Regular Resolved
April 1, 2021 Combined Uranium Monitoring, Regular Resolved
April 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
April 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
March 15, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 15, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 15, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 25, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 25, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 25, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 16, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 16, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 16, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 1, 2021 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2021 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2021 Chlorobenzene Monitoring, Regular Resolved
January 1, 2021 Chlorobenzene Monitoring, Regular Resolved
January 1, 2021 Toluene Monitoring, Regular Resolved
January 1, 2021 Toluene Monitoring, Regular Resolved
January 1, 2021 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2021 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2021 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2021 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2021 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2021 Trichloroethylene Monitoring, Regular Resolved
January 1, 2021 Trichloroethylene Monitoring, Regular Resolved
January 1, 2021 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2021 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2021 Styrene Monitoring, Regular Resolved
January 1, 2021 Styrene Monitoring, Regular Resolved
January 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2021 Heptachlor Epoxide Monitoring, Regular Resolved
January 1, 2021 Heptachlor Epoxide Monitoring, Regular Resolved
January 1, 2021 Hexachlorobenzene Monitoring, Regular Resolved
January 1, 2021 Hexachlorobenzene Monitoring, Regular Resolved
January 1, 2021 Atrazine Monitoring, Regular Resolved
January 1, 2021 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2021 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2021 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2021 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2021 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2021 Dichloromethane Monitoring, Regular Resolved
January 1, 2021 Dichloromethane Monitoring, Regular Resolved
January 1, 2021 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2021 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2021 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2021 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2021 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2021 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2021 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2021 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2021 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2021 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2021 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2021 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2021 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2021 Dichloromethane Monitoring, Regular Resolved
January 1, 2021 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2021 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2021 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2021 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2021 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2021 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2021 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2021 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2021 Trichloroethylene Monitoring, Regular Resolved
January 1, 2021 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2021 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2021 Chlorobenzene Monitoring, Regular Resolved
January 1, 2021 Toluene Monitoring, Regular Resolved
January 1, 2021 Styrene Monitoring, Regular Resolved
January 1, 2021 Endrin Monitoring, Regular Resolved
January 1, 2021 Endrin Monitoring, Regular Resolved
January 1, 2021 Bhc-Gamma Monitoring, Regular Resolved
January 1, 2021 Bhc-Gamma Monitoring, Regular Resolved
January 1, 2021 Toxaphene Monitoring, Regular Resolved
January 1, 2021 Toxaphene Monitoring, Regular Resolved
January 1, 2021 Di(2-Ethylhexyl) Phthalate Monitoring, Regular Resolved
January 1, 2021 Di(2-Ethylhexyl) Phthalate Monitoring, Regular Resolved
January 1, 2021 Atrazine Monitoring, Regular Resolved
January 1, 2021 Methoxychlor Monitoring, Regular Resolved
January 1, 2021 Methoxychlor Monitoring, Regular Resolved
January 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 1, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 1, 2021 Pentachlorophenol Monitoring, Regular Resolved
January 1, 2021 Pentachlorophenol Monitoring, Regular Resolved
January 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2021 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2021 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2021 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2021 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2021 Nitrate Monitoring, Regular Resolved
January 1, 2021 Nitrate Monitoring, Regular Resolved
January 1, 2021 Nitrate Monitoring, Regular Resolved
January 1, 2021 Nitrate Monitoring, Regular Resolved
January 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2021 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2021 Benzo(a)Pyrene Monitoring, Regular Resolved
January 1, 2021 Benzo(a)Pyrene Monitoring, Regular Resolved
January 1, 2021 Simazine Monitoring, Regular Resolved
January 1, 2021 Simazine Monitoring, Regular Resolved
January 1, 2021 Lasso Monitoring, Regular Resolved
January 1, 2021 Lasso Monitoring, Regular Resolved
January 1, 2021 Hexachlorocyclopentadiene Monitoring, Regular Resolved
January 1, 2021 Hexachlorocyclopentadiene Monitoring, Regular Resolved
January 1, 2021 Combined Uranium Monitoring, Regular Resolved
January 1, 2021 Combined Uranium Monitoring, Regular Resolved
January 1, 2021 Combined Uranium Monitoring, Regular Resolved
January 1, 2021 Combined Uranium Monitoring, Regular Resolved
January 1, 2021 Chlordane Monitoring, Regular Resolved
January 1, 2021 Chlordane Monitoring, Regular Resolved
January 1, 2021 Xylenes, Total Monitoring, Regular Resolved
January 1, 2021 Xylenes, Total Monitoring, Regular Resolved
January 1, 2021 Xylenes, Total Monitoring, Regular Resolved
January 1, 2021 Benzene Monitoring, Regular Resolved
January 1, 2021 Benzene Monitoring, Regular Resolved
January 1, 2021 Benzene Monitoring, Regular Resolved
January 1, 2021 Ethylbenzene Monitoring, Regular Resolved
January 1, 2021 Ethylbenzene Monitoring, Regular Resolved
January 1, 2021 Ethylbenzene Monitoring, Regular Resolved
January 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2021 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2021 Heptachlor Monitoring, Regular Resolved
January 1, 2021 Heptachlor Monitoring, Regular Resolved
January 1, 2021 Di(2-Ethylhexyl) Adipate Monitoring, Regular Resolved
January 1, 2021 Di(2-Ethylhexyl) Adipate Monitoring, Regular Resolved
December 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
November 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2020 Combined Uranium Monitoring, Regular Resolved
October 1, 2020 Combined Uranium Monitoring, Regular Resolved
October 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2020 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2020 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2020 Combined Uranium Monitoring, Regular Resolved
October 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2020 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2020 Combined Uranium Monitoring, Regular Resolved
October 1, 2020 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
September 13, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 13, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 2, 2020 Revised Total Coliform Rule Treatment Technique, Level 1 Assessment (RTCR) Addressed
July 2, 2020 Revised Total Coliform Rule Treatment Technique, Level 1 Assessment (RTCR) Addressed
July 2, 2020 Revised Total Coliform Rule Treatment Technique, Level 1 Assessment (RTCR) Addressed
July 2, 2020 Revised Total Coliform Rule Treatment Technique, Level 1 Assessment (RTCR) Addressed
July 1, 2020 Combined Uranium Monitoring, Regular Resolved
July 1, 2020 Combined Uranium Monitoring, Regular Resolved
July 1, 2020 Combined Uranium Monitoring, Regular Resolved
July 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2020 Combined Uranium Monitoring, Regular Resolved
July 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 1, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2020 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2020 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
June 25, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 25, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 25, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2020 Combined Uranium Monitoring, Regular Resolved
April 1, 2020 Combined Uranium Monitoring, Regular Resolved
April 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2020 Combined Uranium Monitoring, Regular Resolved
April 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2020 Combined Uranium Monitoring, Regular Resolved
April 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
March 23, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 23, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 23, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 23, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 12, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 12, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 12, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 9, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 9, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 9, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 9, 2020 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 1, 2020 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2020 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2020 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2020 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 Trichloroethylene Monitoring, Regular Resolved
January 1, 2020 Trichloroethylene Monitoring, Regular Resolved
January 1, 2020 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2020 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2020 Benzene Monitoring, Regular Resolved
January 1, 2020 Benzene Monitoring, Regular Resolved
January 1, 2020 Toluene Monitoring, Regular Resolved
January 1, 2020 Toluene Monitoring, Regular Resolved
January 1, 2020 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2020 Benzene Monitoring, Regular Resolved
January 1, 2020 Toluene Monitoring, Regular Resolved
January 1, 2020 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2020 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2020 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 Trichloroethylene Monitoring, Regular Resolved
January 1, 2020 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2020 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2020 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 Trichloroethylene Monitoring, Regular Resolved
January 1, 2020 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2020 Benzene Monitoring, Regular Resolved
January 1, 2020 Toluene Monitoring, Regular Resolved
January 1, 2020 Oxamyl Monitoring, Regular Resolved
January 1, 2020 Aldicarb Sulfoxide Monitoring, Regular Resolved
January 1, 2020 Aldicarb Sulfoxide Monitoring, Regular Resolved
January 1, 2020 Aldicarb Sulfoxide Monitoring, Regular Resolved
January 1, 2020 Aldicarb Sulfone Monitoring, Regular Resolved
January 1, 2020 Aldicarb Sulfone Monitoring, Regular Resolved
January 1, 2020 Aldicarb Sulfone Monitoring, Regular Resolved
January 1, 2020 Dalapon Monitoring, Regular Resolved
January 1, 2020 Dalapon Monitoring, Regular Resolved
January 1, 2020 Dalapon Monitoring, Regular Resolved
January 1, 2020 Picloram Monitoring, Regular Resolved
January 1, 2020 Picloram Monitoring, Regular Resolved
January 1, 2020 Picloram Monitoring, Regular Resolved
January 1, 2020 2,4-D Monitoring, Regular Resolved
January 1, 2020 2,4-D Monitoring, Regular Resolved
January 1, 2020 2,4-D Monitoring, Regular Resolved
January 1, 2020 2,4,5-Tp Monitoring, Regular Resolved
January 1, 2020 2,4,5-Tp Monitoring, Regular Resolved
January 1, 2020 2,4,5-Tp Monitoring, Regular Resolved
January 1, 2020 Oxamyl Monitoring, Regular Resolved
January 1, 2020 Oxamyl Monitoring, Regular Resolved
January 1, 2020 Mercury Monitoring, Regular Resolved
January 1, 2020 Mercury Monitoring, Regular Resolved
January 1, 2020 Mercury Monitoring, Regular Resolved
January 1, 2020 Antimony, Total Monitoring, Regular Resolved
January 1, 2020 Antimony, Total Monitoring, Regular Resolved
January 1, 2020 Antimony, Total Monitoring, Regular Resolved
January 1, 2020 Beryllium, Total Monitoring, Regular Resolved
January 1, 2020 Beryllium, Total Monitoring, Regular Resolved
January 1, 2020 Beryllium, Total Monitoring, Regular Resolved
January 1, 2020 Thallium, Total Monitoring, Regular Resolved
January 1, 2020 Thallium, Total Monitoring, Regular Resolved
January 1, 2020 Thallium, Total Monitoring, Regular Resolved
January 1, 2020 Carbofuran Monitoring, Regular Resolved
January 1, 2020 Carbofuran Monitoring, Regular Resolved
January 1, 2020 Carbofuran Monitoring, Regular Resolved
January 1, 2020 Aldicarb Monitoring, Regular Resolved
January 1, 2020 Aldicarb Monitoring, Regular Resolved
January 1, 2020 Aldicarb Monitoring, Regular Resolved
January 1, 2020 1,2-Dibromo-3-Chloropropane Monitoring, Regular Resolved
January 1, 2020 1,2-Dibromo-3-Chloropropane Monitoring, Regular Resolved
January 1, 2020 1,2-Dibromo-3-Chloropropane Monitoring, Regular Resolved
January 1, 2020 Ethylene Dibromide Monitoring, Regular Resolved
January 1, 2020 Ethylene Dibromide Monitoring, Regular Resolved
January 1, 2020 Ethylene Dibromide Monitoring, Regular Resolved
January 1, 2020 Arsenic Monitoring, Regular Resolved
January 1, 2020 Arsenic Monitoring, Regular Resolved
January 1, 2020 Arsenic Monitoring, Regular Resolved
January 1, 2020 Barium Monitoring, Regular Resolved
January 1, 2020 Barium Monitoring, Regular Resolved
January 1, 2020 Barium Monitoring, Regular Resolved
January 1, 2020 Cadmium Monitoring, Regular Resolved
January 1, 2020 Cadmium Monitoring, Regular Resolved
January 1, 2020 Cadmium Monitoring, Regular Resolved
January 1, 2020 Chlorobenzene Monitoring, Regular Resolved
January 1, 2020 Chlorobenzene Monitoring, Regular Resolved
January 1, 2020 Chlorobenzene Monitoring, Regular Resolved
January 1, 2020 Chlorobenzene Monitoring, Regular Resolved
January 1, 2020 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 Fluoride Monitoring, Regular Resolved
January 1, 2020 Fluoride Monitoring, Regular Resolved
January 1, 2020 Fluoride Monitoring, Regular Resolved
January 1, 2020 Nitrate Monitoring, Regular Resolved
January 1, 2020 Nitrate Monitoring, Regular Resolved
January 1, 2020 Nitrate Monitoring, Regular Resolved
January 1, 2020 Nitrate Monitoring, Regular Resolved
January 1, 2020 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2020 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2020 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2020 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2020 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2020 Styrene Monitoring, Regular Resolved
January 1, 2020 Styrene Monitoring, Regular Resolved
January 1, 2020 Styrene Monitoring, Regular Resolved
January 1, 2020 Styrene Monitoring, Regular Resolved
January 1, 2020 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2020 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2020 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2020 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2020 Selenium Monitoring, Regular Resolved
January 1, 2020 Selenium Monitoring, Regular Resolved
January 1, 2020 Selenium Monitoring, Regular Resolved
January 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2020 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2020 Chromium Monitoring, Regular Resolved
January 1, 2020 Chromium Monitoring, Regular Resolved
January 1, 2020 Chromium Monitoring, Regular Resolved
January 1, 2020 Dichloromethane Monitoring, Regular Resolved
January 1, 2020 Dichloromethane Monitoring, Regular Resolved
January 1, 2020 Dichloromethane Monitoring, Regular Resolved
January 1, 2020 Combined Uranium Monitoring, Regular Resolved
January 1, 2020 Combined Uranium Monitoring, Regular Resolved
January 1, 2020 Combined Uranium Monitoring, Regular Resolved
January 1, 2020 Combined Uranium Monitoring, Regular Resolved
January 1, 2020 Dichloromethane Monitoring, Regular Resolved
January 1, 2020 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 Dinoseb Monitoring, Regular Resolved
January 1, 2020 Dinoseb Monitoring, Regular Resolved
January 1, 2020 Dinoseb Monitoring, Regular Resolved
January 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2020 Ethylbenzene Monitoring, Regular Resolved
January 1, 2020 Ethylbenzene Monitoring, Regular Resolved
January 1, 2020 Ethylbenzene Monitoring, Regular Resolved
January 1, 2020 Ethylbenzene Monitoring, Regular Resolved
January 1, 2020 Xylenes, Total Monitoring, Regular Resolved
January 1, 2020 Xylenes, Total Monitoring, Regular Resolved
January 1, 2020 Xylenes, Total Monitoring, Regular Resolved
January 1, 2020 Xylenes, Total Monitoring, Regular Resolved
December 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 4, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 4, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 4, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2019 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2019 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2019 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2019 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2019 Tthm Monitoring and Reporting (DBP) Resolved
October 1, 2019 Tthm Monitoring and Reporting (DBP) Resolved
October 1, 2019 Tthm Monitoring and Reporting (DBP) Resolved
October 1, 2019 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
October 1, 2019 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
October 1, 2019 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
September 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 1, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 1, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2019 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2019 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
June 27, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 27, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 27, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 27, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 27, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 1, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 1, 2019 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2019 Benzene Monitoring, Regular Resolved
January 1, 2019 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2019 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2019 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2019 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2019 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2019 Ethylbenzene Monitoring, Regular Resolved
January 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2019 Nitrate Monitoring, Regular Resolved
January 1, 2019 Nitrate Monitoring, Regular Resolved
January 1, 2019 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2019 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2019 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2019 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2019 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2019 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2019 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2019 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2019 Benzene Monitoring, Regular Resolved
January 1, 2019 Benzene Monitoring, Regular Resolved
January 1, 2019 Ethylbenzene Monitoring, Regular Resolved
January 1, 2019 Ethylbenzene Monitoring, Regular Resolved
January 1, 2019 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2019 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2019 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2019 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2019 Nitrate Monitoring, Regular Resolved
January 1, 2019 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2019 Benzene Monitoring, Regular Resolved
January 1, 2019 Ethylbenzene Monitoring, Regular Resolved
January 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2019 Nitrate Monitoring, Regular Resolved
January 1, 2019 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2019 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2019 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2019 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2019 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2019 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2019 Nitrite Monitoring, Regular Resolved
January 1, 2019 Nitrite Monitoring, Regular Resolved
January 1, 2019 Nitrite Monitoring, Regular Resolved
January 1, 2019 Nitrite Monitoring, Regular Resolved
January 1, 2019 Chlorobenzene Monitoring, Regular Resolved
January 1, 2019 Chlorobenzene Monitoring, Regular Resolved
January 1, 2019 Chlorobenzene Monitoring, Regular Resolved
January 1, 2019 Chlorobenzene Monitoring, Regular Resolved
January 1, 2019 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2019 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2019 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2019 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2019 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2019 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2019 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2019 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2019 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2019 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2019 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2019 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2019 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2019 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2019 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2019 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2019 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2019 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2019 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2019 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2019 Toluene Monitoring, Regular Resolved
January 1, 2019 Toluene Monitoring, Regular Resolved
January 1, 2019 Toluene Monitoring, Regular Resolved
January 1, 2019 Toluene Monitoring, Regular Resolved
January 1, 2019 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2019 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2019 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2019 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2019 Trichloroethylene Monitoring, Regular Resolved
January 1, 2019 Trichloroethylene Monitoring, Regular Resolved
January 1, 2019 Trichloroethylene Monitoring, Regular Resolved
January 1, 2019 Trichloroethylene Monitoring, Regular Resolved
January 1, 2019 Styrene Monitoring, Regular Resolved
January 1, 2019 Styrene Monitoring, Regular Resolved
January 1, 2019 Styrene Monitoring, Regular Resolved
January 1, 2019 Styrene Monitoring, Regular Resolved
January 1, 2019 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2019 Xylenes, Total Monitoring, Regular Resolved
January 1, 2019 Xylenes, Total Monitoring, Regular Resolved
January 1, 2019 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2019 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2019 Xylenes, Total Monitoring, Regular Resolved
January 1, 2019 Xylenes, Total Monitoring, Regular Resolved
January 1, 2019 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2019 Cyanide Monitoring, Regular Resolved
January 1, 2019 Cyanide Monitoring, Regular Resolved
January 1, 2019 Cyanide Monitoring, Regular Resolved
January 1, 2019 Dichloromethane Monitoring, Regular Resolved
January 1, 2019 Dichloromethane Monitoring, Regular Resolved
January 1, 2019 Dichloromethane Monitoring, Regular Resolved
January 1, 2019 Dichloromethane Monitoring, Regular Resolved
October 1, 2018 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2018 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2018 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2018 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2018 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
August 1, 2018 Public Notice Public Notification Violation for NPDWR Violation Resolved
August 1, 2018 Public Notice Public Notification Violation for NPDWR Violation Resolved
August 1, 2018 Public Notice Public Notification Violation for NPDWR Violation Resolved
August 1, 2018 Public Notice Public Notification Violation for NPDWR Violation Resolved
August 1, 2018 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2018 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2018 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2018 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2018 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2018 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2018 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2018 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
May 1, 2018 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2018 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2018 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2018 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2018 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
March 1, 2018 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 1, 2018 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 1, 2018 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 1, 2018 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 28, 2018 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 28, 2018 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 28, 2018 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 28, 2018 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 28, 2018 Revised Total Coliform Rule Treatment Technique, Level 2 Assessment (RTCR) Addressed
January 28, 2018 Revised Total Coliform Rule Treatment Technique, Level 2 Assessment (RTCR) Addressed
January 28, 2018 Revised Total Coliform Rule Treatment Technique, Level 2 Assessment (RTCR) Addressed
January 28, 2018 Revised Total Coliform Rule Treatment Technique, Level 2 Assessment (RTCR) Addressed
January 28, 2018 Revised Total Coliform Rule Treatment Technique, Level 2 Assessment (RTCR) Addressed
January 12, 2018 E. Coli Monitoring, Source Water (GWR) Resolved
January 12, 2018 E. Coli Monitoring, Source Water (GWR) Resolved
January 12, 2018 E. Coli Monitoring, Source Water (GWR) Resolved
January 12, 2018 E. Coli Monitoring, Source Water (GWR) Resolved
January 12, 2018 E. Coli Monitoring, Source Water (GWR) Resolved
January 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2018 Hexachlorocyclopentadiene Monitoring, Regular Resolved
January 1, 2018 Hexachlorocyclopentadiene Monitoring, Regular Resolved
January 1, 2018 Heptachlor Epoxide Monitoring, Regular Resolved
January 1, 2018 Heptachlor Epoxide Monitoring, Regular Resolved
January 1, 2018 Hexachlorobenzene Monitoring, Regular Resolved
January 1, 2018 Hexachlorobenzene Monitoring, Regular Resolved
January 1, 2018 Simazine Monitoring, Regular Resolved
January 1, 2018 Simazine Monitoring, Regular Resolved
January 1, 2018 Benzo(a)Pyrene Monitoring, Regular Resolved
January 1, 2018 Benzo(a)Pyrene Monitoring, Regular Resolved
January 1, 2018 Pentachlorophenol Monitoring, Regular Resolved
January 1, 2018 Pentachlorophenol Monitoring, Regular Resolved
January 1, 2018 Chlordane Monitoring, Regular Resolved
January 1, 2018 Chlordane Monitoring, Regular Resolved
January 1, 2018 Endrin Monitoring, Regular Resolved
January 1, 2018 Methoxychlor Monitoring, Regular Resolved
January 1, 2018 Methoxychlor Monitoring, Regular Resolved
January 1, 2018 Toxaphene Monitoring, Regular Resolved
January 1, 2018 Toxaphene Monitoring, Regular Resolved
January 1, 2018 Endrin Monitoring, Regular Resolved
January 1, 2018 Endrin Monitoring, Regular Resolved
January 1, 2018 Methoxychlor Monitoring, Regular Resolved
January 1, 2018 Toxaphene Monitoring, Regular Resolved
January 1, 2018 Simazine Monitoring, Regular Resolved
January 1, 2018 Hexachlorocyclopentadiene Monitoring, Regular Resolved
January 1, 2018 Heptachlor Epoxide Monitoring, Regular Resolved
January 1, 2018 Hexachlorobenzene Monitoring, Regular Resolved
January 1, 2018 Benzo(a)Pyrene Monitoring, Regular Resolved
January 1, 2018 Pentachlorophenol Monitoring, Regular Resolved
January 1, 2018 Chlordane Monitoring, Regular Resolved
January 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2018 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2018 Endrin Monitoring, Regular Resolved
January 1, 2018 Methoxychlor Monitoring, Regular Resolved
January 1, 2018 Toxaphene Monitoring, Regular Resolved
January 1, 2018 Simazine Monitoring, Regular Resolved
January 1, 2018 Hexachlorocyclopentadiene Monitoring, Regular Resolved
January 1, 2018 Heptachlor Epoxide Monitoring, Regular Resolved
January 1, 2018 Hexachlorobenzene Monitoring, Regular Resolved
January 1, 2018 Benzo(a)Pyrene Monitoring, Regular Resolved
January 1, 2018 Pentachlorophenol Monitoring, Regular Resolved
January 1, 2018 Chlordane Monitoring, Regular Resolved
January 1, 2018 Di(2-Ethylhexyl) Phthalate Monitoring, Regular Resolved
January 1, 2018 Di(2-Ethylhexyl) Phthalate Monitoring, Regular Resolved
January 1, 2018 Di(2-Ethylhexyl) Phthalate Monitoring, Regular Resolved
January 1, 2018 Di(2-Ethylhexyl) Phthalate Monitoring, Regular Resolved
January 1, 2018 Bhc-Gamma Monitoring, Regular Resolved
January 1, 2018 Bhc-Gamma Monitoring, Regular Resolved
January 1, 2018 Bhc-Gamma Monitoring, Regular Resolved
January 1, 2018 Bhc-Gamma Monitoring, Regular Resolved
January 1, 2018 Heptachlor Monitoring, Regular Resolved
January 1, 2018 Heptachlor Monitoring, Regular Resolved
January 1, 2018 Heptachlor Monitoring, Regular Resolved
January 1, 2018 Heptachlor Monitoring, Regular Resolved
January 1, 2018 Di(2-Ethylhexyl) Adipate Monitoring, Regular Resolved
January 1, 2018 Di(2-Ethylhexyl) Adipate Monitoring, Regular Resolved
January 1, 2018 Di(2-Ethylhexyl) Adipate Monitoring, Regular Resolved
January 1, 2018 Di(2-Ethylhexyl) Adipate Monitoring, Regular Resolved
January 1, 2018 Atrazine Monitoring, Regular Resolved
January 1, 2018 Atrazine Monitoring, Regular Resolved
January 1, 2018 Atrazine Monitoring, Regular Resolved
January 1, 2018 Atrazine Monitoring, Regular Resolved
January 1, 2018 Lasso Monitoring, Regular Resolved
January 1, 2018 Lasso Monitoring, Regular Resolved
January 1, 2018 Lasso Monitoring, Regular Resolved
January 1, 2018 Lasso Monitoring, Regular Resolved
October 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
September 25, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 25, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 25, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 1, 2017 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2017 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2017 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Addressed
July 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
June 18, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 18, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 18, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 18, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 5, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 5, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 5, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 5, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 5, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
May 18, 2017 Revised Total Coliform Rule Treatment Technique, Level 1 Assessment (RTCR) Addressed
May 18, 2017 Revised Total Coliform Rule Treatment Technique, Level 1 Assessment (RTCR) Addressed
May 18, 2017 Revised Total Coliform Rule Treatment Technique, Level 1 Assessment (RTCR) Addressed
May 18, 2017 Revised Total Coliform Rule Treatment Technique, Level 1 Assessment (RTCR) Addressed
May 18, 2017 Revised Total Coliform Rule Treatment Technique, Level 1 Assessment (RTCR) Addressed
May 2, 2017 E. Coli Monitoring, Source Water (GWR) Resolved
May 2, 2017 E. Coli Monitoring, Source Water (GWR) Resolved
May 2, 2017 E. Coli Monitoring, Source Water (GWR) Resolved
May 2, 2017 E. Coli Monitoring, Source Water (GWR) Resolved
May 2, 2017 E. Coli Monitoring, Source Water (GWR) Resolved
May 2, 2017 E. Coli Monitoring, Source Water (GWR) Resolved
April 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
March 13, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 13, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 13, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 13, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 16, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 16, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 16, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 16, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 16, 2017 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2017 Fluoride Monitoring, Regular Resolved
January 1, 2017 Oxamyl Monitoring, Regular Resolved
January 1, 2017 Arsenic Monitoring, Regular Resolved
January 1, 2017 Barium Monitoring, Regular Resolved
January 1, 2017 Chromium Monitoring, Regular Resolved
January 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2017 Ethylene Dibromide Monitoring, Regular Resolved
January 1, 2017 Ethylene Dibromide Monitoring, Regular Resolved
January 1, 2017 Picloram Monitoring, Regular Resolved
January 1, 2017 Picloram Monitoring, Regular Resolved
January 1, 2017 2,4,5-Tp Monitoring, Regular Resolved
January 1, 2017 2,4,5-Tp Monitoring, Regular Resolved
January 1, 2017 Fluoride Monitoring, Regular Resolved
January 1, 2017 Fluoride Monitoring, Regular Resolved
January 1, 2017 Oxamyl Monitoring, Regular Resolved
January 1, 2017 Oxamyl Monitoring, Regular Resolved
January 1, 2017 Arsenic Monitoring, Regular Resolved
January 1, 2017 Barium Monitoring, Regular Resolved
January 1, 2017 Chromium Monitoring, Regular Resolved
January 1, 2017 Chromium Monitoring, Regular Resolved
January 1, 2017 Mercury Monitoring, Regular Resolved
January 1, 2017 Mercury Monitoring, Regular Resolved
January 1, 2017 Antimony, Total Monitoring, Regular Resolved
January 1, 2017 Antimony, Total Monitoring, Regular Resolved
January 1, 2017 Beryllium, Total Monitoring, Regular Resolved
January 1, 2017 Beryllium, Total Monitoring, Regular Resolved
January 1, 2017 Arsenic Monitoring, Regular Resolved
January 1, 2017 Barium Monitoring, Regular Resolved
January 1, 2017 Ethylene Dibromide Monitoring, Regular Resolved
January 1, 2017 Picloram Monitoring, Regular Resolved
January 1, 2017 2,4,5-Tp Monitoring, Regular Resolved
January 1, 2017 Mercury Monitoring, Regular Resolved
January 1, 2017 Antimony, Total Monitoring, Regular Resolved
January 1, 2017 Beryllium, Total Monitoring, Regular Resolved
January 1, 2017 Fluoride Monitoring, Regular Resolved
January 1, 2017 Oxamyl Monitoring, Regular Resolved
January 1, 2017 Arsenic Monitoring, Regular Resolved
January 1, 2017 Barium Monitoring, Regular Resolved
January 1, 2017 Chromium Monitoring, Regular Resolved
January 1, 2017 Mercury Monitoring, Regular Resolved
January 1, 2017 Antimony, Total Monitoring, Regular Resolved
January 1, 2017 Beryllium, Total Monitoring, Regular Resolved
January 1, 2017 Ethylene Dibromide Monitoring, Regular Resolved
January 1, 2017 Picloram Monitoring, Regular Resolved
January 1, 2017 2,4,5-Tp Monitoring, Regular Resolved
January 1, 2017 Aldicarb Monitoring, Regular Resolved
January 1, 2017 Aldicarb Monitoring, Regular Resolved
January 1, 2017 Aldicarb Monitoring, Regular Resolved
January 1, 2017 Aldicarb Monitoring, Regular Resolved
January 1, 2017 Aldicarb Sulfone Monitoring, Regular Resolved
January 1, 2017 Aldicarb Sulfone Monitoring, Regular Resolved
January 1, 2017 Aldicarb Sulfone Monitoring, Regular Resolved
January 1, 2017 Aldicarb Sulfone Monitoring, Regular Resolved
January 1, 2017 Dalapon Monitoring, Regular Resolved
January 1, 2017 Dalapon Monitoring, Regular Resolved
January 1, 2017 Dalapon Monitoring, Regular Resolved
January 1, 2017 Dalapon Monitoring, Regular Resolved
January 1, 2017 Thallium, Total Monitoring, Regular Resolved
January 1, 2017 Thallium, Total Monitoring, Regular Resolved
January 1, 2017 Thallium, Total Monitoring, Regular Resolved
January 1, 2017 Thallium, Total Monitoring, Regular Resolved
January 1, 2017 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2017 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2017 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2017 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2017 Carbofuran Monitoring, Regular Resolved
January 1, 2017 Combined Uranium Monitoring, Regular Resolved
January 1, 2017 Combined Uranium Monitoring, Regular Resolved
January 1, 2017 Carbofuran Monitoring, Regular Resolved
January 1, 2017 Carbofuran Monitoring, Regular Resolved
January 1, 2017 Combined Uranium Monitoring, Regular Resolved
January 1, 2017 Combined Uranium Monitoring, Regular Resolved
January 1, 2017 Carbofuran Monitoring, Regular Resolved
January 1, 2017 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2017 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2017 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2017 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2017 2,4-D Monitoring, Regular Resolved
January 1, 2017 2,4-D Monitoring, Regular Resolved
January 1, 2017 2,4-D Monitoring, Regular Resolved
January 1, 2017 2,4-D Monitoring, Regular Resolved
January 1, 2017 Aldicarb Sulfoxide Monitoring, Regular Resolved
January 1, 2017 Cadmium Monitoring, Regular Resolved
January 1, 2017 Aldicarb Sulfoxide Monitoring, Regular Resolved
January 1, 2017 Aldicarb Sulfoxide Monitoring, Regular Resolved
January 1, 2017 Cadmium Monitoring, Regular Resolved
January 1, 2017 Cadmium Monitoring, Regular Resolved
January 1, 2017 Aldicarb Sulfoxide Monitoring, Regular Resolved
January 1, 2017 Cadmium Monitoring, Regular Resolved
January 1, 2017 1,2-Dibromo-3-Chloropropane Monitoring, Regular Resolved
January 1, 2017 1,2-Dibromo-3-Chloropropane Monitoring, Regular Resolved
January 1, 2017 1,2-Dibromo-3-Chloropropane Monitoring, Regular Resolved
January 1, 2017 1,2-Dibromo-3-Chloropropane Monitoring, Regular Resolved
January 1, 2017 Dinoseb Monitoring, Regular Resolved
January 1, 2017 Dinoseb Monitoring, Regular Resolved
January 1, 2017 Dinoseb Monitoring, Regular Resolved
January 1, 2017 Dinoseb Monitoring, Regular Resolved
January 1, 2017 Selenium Monitoring, Regular Resolved
January 1, 2017 Selenium Monitoring, Regular Resolved
January 1, 2017 Selenium Monitoring, Regular Resolved
January 1, 2017 Selenium Monitoring, Regular Resolved
October 13, 2016 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 13, 2016 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 13, 2016 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 13, 2016 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 1, 2016 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2016 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2016 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2016 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2016 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2016 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2016 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2016 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2016 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2016 Chlorine Monitoring and Reporting (DBP) Resolved

Data from EPA SDWIS (violation records) , last refreshed May 24, 2026.

Where to see every contaminant this utility tested for

EPA's bulk SDWIS dataset gives MyTapWater.us per-system measured values for lead and copper, plus violation records for everything else. To see every regulated contaminant this utility tested for in the past year (TTHMs, HAA5, nitrate, arsenic, fluoride, chromium, etc.) with measured values, read the utility's Consumer Confidence Report (CCR).

Every community water system is required by EPA to publish a CCR annually, by July 1, listing every contaminant they sampled, the measured value, the federal limit, and any health-based exceedances. Most utilities post the report online; some mail it with your bill.

How to find NICO TYME WATER COOP's CCR:

Compare nearby utilities by population served.

Contact this utility

Public administrative contact information for this water system, as filed with the EPA. Use this to ask about your service line, request your home's lead status, or report a water quality issue.

Administrator
WILLEFORD, BILL
Phone
210-849-8025
Mailing address
4749 HARDY RD LOT 21
ELMENDORF, TX 78112-5431

Where this page's data comes from

Bundle released 2026-Q2, regenerated May 24, 2026. Each section above also shows its own source date so you can tell at a glance how fresh that part of the page is.

Every value on this page is cross-verified before publication; read our methodology for the verification steps and corrections process.