Skip to main content
MyTapWater.us

PWSID GA1970000

BUENA VISTA

Community water system based in Buena Vista, GA

Service area on file with EPA: Buena Vista · Marion County. EPA's recorded service area can be incomplete for regional authorities. The cities and counties above are what the utility has filed with EPA; the utility may serve additional areas.

Population served
1,422
Source
Groundwater
Status
Active

At a glance

1 finding worth watching

Past 5 years: 30 health-based violations on file, all marked Resolved or Archived. See compliance history below.

Risk classification follows EPA's published values for safe drinking water, with caution and concern bands reviewed by a clinician. Past resolved violations do not influence this card. See methodology.

Lead service line inventory

No inventory data on file

We do not yet have this utility's published Lead Service Line Inventory on file. The EPA Lead and Copper Rule Improvements (LCRI) required every community water system to publish one by October 16, 2024 and to identify and replace any lead lines within 10 years. How lead enters drinking water.

Phase 1 coverage focuses on the largest NC utilities. Smaller systems will be added; in the meantime, ask your utility for their inventory or check their Consumer Confidence Report.

Lead and copper test results

The most recent measurement per contaminant from EPA's Lead and Copper Rule sampling.

Why only lead and copper, and not arsenic, nitrate, or others?

EPA's bulk SDWIS download is the only nationwide per-system sample data they publish, and it only includes the Lead and Copper Rule table. Values for other regulated contaminants (TTHMs, nitrate, arsenic, etc.) appear on this page only when they trigger a violation. For the full per-system contaminant suite, see the utility's annual Consumer Confidence Report (link further down the page).

Most recent measurements per contaminant (Lead and Copper Rule) . Sorted by risk: concern first, then caution, then unrated, then safe.
Contaminant Most recent Date Risk
PB90
0.0016 mg/L December 31, 2025 Caution

Data from EPA SDWIS (Lead and Copper Rule sample table) , last refreshed May 24, 2026.

Fluoride

Per CDC My Water's Fluoride

BUENA VISTA adds fluoride to its drinking water.

CDC classifies a system as fluoridated when it adjusts fluoride to the recommended level, or when it buys water from a system that does. The U.S. Public Health Service recommends 0.7 mg/L for community water fluoridation.

Source: CDC My Water's Fluoride, listed under CITY OF BUENA VISTA (Marion County). Verify on CDC's site .

Area context

Marion County, GA (2020 data)

Community water systems
2 of 2 add fluoride
Population on fluoridated water
6,465 of 6,465 (100.0%)

Georgia statewide (2020 data)

Population on fluoridated water
8,671,136 of 9,135,654 (94.9%)
Community water systems adding fluoride
570 of 1,728

Data from CDC My Water's Fluoride (per-system status) , last refreshed May 19, 2026.

Data from CDC Water Fluoridation Reporting System (state and county aggregates) , last refreshed May 16, 2026.

Recorded contaminant measurements (from violations)

When this system exceeded a regulatory limit and EPA recorded the measured value, that value is shown here. These are not routine sample results: they are the values the violation was triggered on.

Measured values from recorded violations . Most recent first.
Period Contaminant Measured Federal MCL Status
July 1, 2025Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
April 1, 2025Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
April 1, 2025Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
January 1, 2025Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
January 1, 2025Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
October 1, 2024Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
October 1, 2024Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
October 1, 2024Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
July 1, 2024Combined Radium (-226 and -228)7PCI/L5 PCI/L Health-based
July 1, 2024Combined Radium (-226 and -228)7PCI/L5 PCI/L Health-based
July 1, 2024Combined Radium (-226 and -228)7PCI/L5 PCI/L Health-based
April 1, 2024Combined Radium (-226 and -228)7PCI/L5 PCI/L Health-based
April 1, 2024Combined Radium (-226 and -228)7PCI/L5 PCI/L Health-based
April 1, 2024Combined Radium (-226 and -228)7PCI/L5 PCI/L Health-based
July 1, 2022Combined Radium (-226 and -228)7PCI/L5 PCI/L Health-based
July 1, 2022Combined Radium (-226 and -228)7PCI/L5 PCI/L Health-based
July 1, 2022Combined Radium (-226 and -228)7PCI/L5 PCI/L Health-based
July 1, 2022Combined Radium (-226 and -228)7PCI/L5 PCI/L Health-based
April 1, 2022Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
April 1, 2022Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
April 1, 2022Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
April 1, 2022Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
January 1, 2022Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
January 1, 2022Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
January 1, 2022Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
January 1, 2022Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
October 1, 2021Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
October 1, 2021Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
October 1, 2021Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based
October 1, 2021Combined Radium (-226 and -228)6PCI/L5 PCI/L Health-based

Data from EPA SDWIS (violation records) , last refreshed May 24, 2026.

Compliance history

EPA-recorded violations against this system over the last 5 years.

How to read this section

Health-based violations are when a measured limit was exceeded; the measured concentration is shown alongside the EPA federal limit where SDWIS published it. Monitoring and reporting items are paperwork issues (missed sample dates, late filings) that do not themselves indicate unsafe water.

30 resolved health-based violations in the last 5 years

All 30 health-based violations in the last 5 years are marked Resolved or Archived. Past violations do not represent current water quality.

Health-based violations in the last 5 years
Period start Contaminant What happened Measured level Status
July 1, 2025 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2025 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2025 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
January 1, 2025 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
January 1, 2025 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
October 1, 2024 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
October 1, 2024 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
October 1, 2024 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
July 1, 2024 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
7 PCI/L
MCL 5 PCI/L
Resolved
July 1, 2024 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
7 PCI/L
MCL 5 PCI/L
Resolved
July 1, 2024 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
7 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2024 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
7 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2024 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
7 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2024 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
7 PCI/L
MCL 5 PCI/L
Resolved
July 1, 2022 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
7 PCI/L
MCL 5 PCI/L
Resolved
July 1, 2022 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
7 PCI/L
MCL 5 PCI/L
Resolved
July 1, 2022 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
7 PCI/L
MCL 5 PCI/L
Resolved
July 1, 2022 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
7 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2022 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2022 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2022 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2022 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
January 1, 2022 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
January 1, 2022 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
January 1, 2022 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
January 1, 2022 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
October 1, 2021 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
October 1, 2021 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
October 1, 2021 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
October 1, 2021 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
76 monitoring and reporting item s (paperwork) , 5 still open · these are not health risks
Monitoring and reporting items in the last 5 years
Period start Relates to Item Status
February 21, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
February 21, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 24, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 24, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 24, 2025 Public Notice Public Notification Violation for NPDWR Violation Unaddressed
November 16, 2024 Public Notice Public Notification Violation for NPDWR Violation Resolved
November 16, 2024 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Addressed
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Addressed
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Addressed
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Addressed
January 1, 2024 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2024 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2024 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2024 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
January 1, 2024 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2024 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2024 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2024 Combined Radium (-226 and -228) Monitoring, Regular Resolved
January 1, 2024 Combined Uranium Monitoring, Regular Resolved
January 1, 2024 Combined Uranium Monitoring, Regular Resolved
January 1, 2024 Combined Uranium Monitoring, Regular Resolved
January 1, 2024 Combined Uranium Monitoring, Regular Resolved
October 1, 2023 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2023 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2023 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2023 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2023 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2023 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2023 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2023 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2023 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2023 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2023 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2023 Combined Uranium Monitoring, Regular Resolved
October 1, 2023 Combined Uranium Monitoring, Regular Resolved
October 1, 2023 Combined Uranium Monitoring, Regular Resolved
October 1, 2023 Combined Uranium Monitoring, Regular Resolved
January 2, 2023 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 2, 2023 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 2, 2023 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 2, 2023 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 25, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 25, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
July 1, 2022 Combined Uranium Monitoring, Regular Resolved
July 1, 2022 Combined Uranium Monitoring, Regular Resolved
July 1, 2022 Combined Uranium Monitoring, Regular Resolved
July 1, 2022 Combined Uranium Monitoring, Regular Resolved
July 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
July 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2022 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
April 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2022 Combined Radium (-226 and -228) Monitoring, Regular Resolved
April 1, 2022 Combined Uranium Monitoring, Regular Resolved
April 1, 2022 Combined Uranium Monitoring, Regular Resolved
April 1, 2022 Combined Uranium Monitoring, Regular Resolved
April 1, 2022 Combined Uranium Monitoring, Regular Resolved
March 27, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 27, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 30, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 30, 2022 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 31, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 31, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 25, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
September 25, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
65 older violation s (5-10 years ago) · 19 health-based, 46 paperwork , all resolved
Violations 5-10 years ago (65 total)
Period start Relates to Item Measured level Status
April 1, 2021 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2021 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2021 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2021 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
6 PCI/L
MCL 5 PCI/L
Resolved
January 14, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
January 14, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 13, 2020 E. Coli Monitoring, Source Water (GWR) Resolved
August 13, 2020 E. Coli Monitoring, Source Water (GWR) Resolved
August 13, 2020 E. Coli Monitoring, Source Water (GWR) Resolved
August 13, 2020 E. Coli Monitoring, Source Water (GWR) Resolved
July 1, 2020 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2020 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
October 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
10 PCI/L
MCL 5 PCI/L
Resolved
October 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
10 PCI/L
MCL 5 PCI/L
Resolved
October 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
10 PCI/L
MCL 5 PCI/L
Resolved
October 1, 2019 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2019 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2019 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2019 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
July 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
13 PCI/L
MCL 5 PCI/L
Resolved
July 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
13 PCI/L
MCL 5 PCI/L
Resolved
July 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
13 PCI/L
MCL 5 PCI/L
Resolved
July 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
13 PCI/L
MCL 5 PCI/L
Resolved
July 1, 2019 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2019 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
April 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
11 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
11 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
11 PCI/L
MCL 5 PCI/L
Resolved
April 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
11 PCI/L
MCL 5 PCI/L
Resolved
January 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
13 PCI/L
MCL 5 PCI/L
Resolved
January 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
13 PCI/L
MCL 5 PCI/L
Resolved
January 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
13 PCI/L
MCL 5 PCI/L
Resolved
January 1, 2019 Combined Radium (-226 and -228) Maximum Contaminant Level Violation, Average
13 PCI/L
MCL 5 PCI/L
Resolved
October 1, 2018 Combined Uranium Monitoring, Regular Resolved
October 1, 2018 Combined Uranium Monitoring, Regular Resolved
October 1, 2018 Combined Uranium Monitoring, Regular Resolved
October 1, 2018 Combined Uranium Monitoring, Regular Resolved
October 1, 2018 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2018 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2018 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2018 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2018 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2018 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2018 Gross Alpha, Excl. Radon and U Monitoring, Regular Resolved
October 1, 2018 Combined Radium (-226 and -228) Monitoring, Regular Resolved
October 1, 2018 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2018 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2018 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
September 1, 2018 Tthm Monitoring and Reporting (DBP) Resolved
September 1, 2018 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
September 1, 2018 Tthm Monitoring and Reporting (DBP) Resolved
September 1, 2018 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
September 1, 2018 Tthm Monitoring and Reporting (DBP) Resolved
September 1, 2018 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
July 1, 2018 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2018 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2017 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2017 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2017 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2016 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved
July 1, 2016 Consumer Confidence Rule Consumer Confidence Report Complete Failure to Report Resolved

Data from EPA SDWIS (violation records) , last refreshed May 24, 2026.

Where to see every contaminant this utility tested for

EPA's bulk SDWIS dataset gives MyTapWater.us per-system measured values for lead and copper, plus violation records for everything else. To see every regulated contaminant this utility tested for in the past year (TTHMs, HAA5, nitrate, arsenic, fluoride, chromium, etc.) with measured values, read the utility's Consumer Confidence Report (CCR).

Every community water system is required by EPA to publish a CCR annually, by July 1, listing every contaminant they sampled, the measured value, the federal limit, and any health-based exceedances. Most utilities post the report online; some mail it with your bill.

How to find BUENA VISTA's CCR:

Compare nearby utilities by population served.

Contact this utility

Public administrative contact information for this water system, as filed with the EPA. Use this to ask about your service line, request your home's lead status, or report a water quality issue.

Administrator
BROWN, KEVIN T.
Phone
229-649-7888
Email
mayorkevintbrown@cityofbuenavista.org
Mailing address
Post Office 158
BUENA VISTA, GA 31803

Where this page's data comes from

Bundle released 2026-Q2, regenerated May 24, 2026. Each section above also shows its own source date so you can tell at a glance how fresh that part of the page is.

Every value on this page is cross-verified before publication; read our methodology for the verification steps and corrections process.