Skip to main content
MyTapWater.us

PWSID CO0108420

MONARCH MOUNTAIN LODGE

Non-transient non-community based in Katy, TX

Population served
247
Source
Surface water
Status
Active

At a glance

3 above the safety limit, 1 detection to watch

Past 5 years: 8 health-based violations on file, all marked Resolved or Archived. See compliance history below.

Risk classification follows EPA's published values for safe drinking water, with caution and concern bands reviewed by a clinician. Past resolved violations do not influence this card. See methodology.

Lead service line inventory

No inventory data on file

We do not yet have this utility's published Lead Service Line Inventory on file. The EPA Lead and Copper Rule Improvements (LCRI) required every community water system to publish one by October 16, 2024 and to identify and replace any lead lines within 10 years. How lead enters drinking water.

Phase 1 coverage focuses on the largest NC utilities. Smaller systems will be added; in the meantime, ask your utility for their inventory or check their Consumer Confidence Report.

Lead and copper test results

The most recent measurement per contaminant from EPA's Lead and Copper Rule sampling.

Why only lead and copper, and not arsenic, nitrate, or others?

EPA's bulk SDWIS download is the only nationwide per-system sample data they publish, and it only includes the Lead and Copper Rule table. Values for other regulated contaminants (TTHMs, nitrate, arsenic, etc.) appear on this page only when they trigger a violation. For the full per-system contaminant suite, see the utility's annual Consumer Confidence Report (link further down the page).

Most recent measurements per contaminant (Lead and Copper Rule) . Sorted by risk: concern first, then caution, then unrated, then safe.
Contaminant Most recent Date Risk
PB90
0.004 mg/L December 31, 2023 Caution

Data from EPA SDWIS (Lead and Copper Rule sample table) , last refreshed May 24, 2026.

Fluoride

We don't yet have this utility's specific fluoridation status from CDC's My Water's Fluoride listing. The figures below describe the broader area, not MONARCH MOUNTAIN LODGE itself.

Area context

Texas statewide (2020 data)

Population on fluoridated water
19,743,163 of 27,818,869 (71.0%)
Community water systems adding fluoride
2,573 of 6,046

Look up your specific utility

Texas shares per-system data on CDC's My Water's Fluoride site. Search by water system to see whether MONARCH MOUNTAIN LODGE adds fluoride.

CDC My Water's Fluoride: search by water system

Data from CDC Water Fluoridation Reporting System (state and county aggregates) , last refreshed May 16, 2026.

Compliance history

EPA-recorded violations against this system over the last 5 years.

How to read this section

Health-based violations are when a measured limit was exceeded; the measured concentration is shown alongside the EPA federal limit where SDWIS published it. Monitoring and reporting items are paperwork issues (missed sample dates, late filings) that do not themselves indicate unsafe water.

3 active health-based violations

EPA records 3 health-based violations that have not yet been resolved. An additional 8 health-based violations in the last 5 years are already resolved.

Health-based violations in the last 5 years
Period start Contaminant What happened Measured level Status
October 17, 2024 Lead and Copper Rule Revisions LSL Inventory Not reported Addressed
October 17, 2024 Lead and Copper Rule Revisions LSL Inventory Not reported Addressed
October 17, 2024 Lead and Copper Rule Revisions LSL Inventory Not reported Addressed
May 1, 2024 Interim Enhanced Surface Water Treatment Rule Monthly Turbidity Exceed (Enhanced SWTR) Not reported Resolved
May 1, 2024 Interim Enhanced Surface Water Treatment Rule Monthly Turbidity Exceed (Enhanced SWTR) Not reported Resolved
May 1, 2024 Interim Enhanced Surface Water Treatment Rule Monthly Turbidity Exceed (Enhanced SWTR) Not reported Resolved
May 1, 2024 Interim Enhanced Surface Water Treatment Rule Monthly Turbidity Exceed (Enhanced SWTR) Not reported Resolved
November 1, 2021 Stage 1 Disinfectants and Disinfection Byproducts Rule Treatment Technique No Certif. Operator Not reported Resolved
November 1, 2021 Stage 1 Disinfectants and Disinfection Byproducts Rule Treatment Technique No Certif. Operator Not reported Resolved
November 1, 2021 Stage 1 Disinfectants and Disinfection Byproducts Rule Treatment Technique No Certif. Operator Not reported Resolved
November 1, 2021 Stage 1 Disinfectants and Disinfection Byproducts Rule Treatment Technique No Certif. Operator Not reported Resolved
318 monitoring and reporting item s (paperwork) , 14 still open · these are not health risks
Monitoring and reporting items in the last 5 years
Period start Relates to Item Status
November 1, 2025 Public Notice Public Notification Violation without NPDWR Violation Resolved
November 1, 2025 Public Notice Public Notification Violation without NPDWR Violation Resolved
October 31, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 31, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
October 18, 2025 Public Notice Public Notification Violation without NPDWR Violation Resolved
October 18, 2025 Public Notice Public Notification Violation without NPDWR Violation Resolved
October 1, 2025 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
October 1, 2025 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Unaddressed
October 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
October 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
October 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
October 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
September 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
September 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
July 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
July 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
July 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
July 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
June 8, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 8, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 8, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
June 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
June 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
June 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
June 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
May 5, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
May 5, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
May 5, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
May 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
May 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
May 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
May 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
April 29, 2025 Public Notice Public Notification Violation without NPDWR Violation Resolved
April 29, 2025 Public Notice Public Notification Violation without NPDWR Violation Resolved
April 29, 2025 Public Notice Public Notification Violation without NPDWR Violation Resolved
April 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
April 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
April 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
April 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
April 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
April 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
April 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
March 8, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 8, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 8, 2025 Public Notice Public Notification Violation for NPDWR Violation Resolved
March 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
March 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
March 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
March 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
March 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2025 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
February 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
February 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
February 1, 2025 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
January 29, 2025 Public Notice Public Notification Violation without NPDWR Violation Resolved
January 29, 2025 Public Notice Public Notification Violation without NPDWR Violation Resolved
January 29, 2025 Public Notice Public Notification Violation without NPDWR Violation Resolved
January 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2025 Chlorine Monitoring and Reporting (DBP) Resolved
December 8, 2024 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 8, 2024 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 8, 2024 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2024 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
December 1, 2024 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
December 1, 2024 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
December 1, 2024 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
November 1, 2024 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
November 1, 2024 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
November 1, 2024 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
November 1, 2024 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
November 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
November 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 29, 2024 Public Notice Public Notification Violation without NPDWR Violation Resolved
October 29, 2024 Public Notice Public Notification Violation without NPDWR Violation Resolved
October 29, 2024 Public Notice Public Notification Violation without NPDWR Violation Resolved
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Addressed
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Addressed
October 17, 2024 Lead and Copper Rule Revisions LSL Reporting Addressed
October 1, 2024 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2024 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2024 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2024 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2024 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2024 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2024 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
August 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2024 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
August 1, 2024 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
August 1, 2024 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
August 1, 2024 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
August 1, 2024 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
July 29, 2024 Public Notice Public Notification Violation without NPDWR Violation Resolved
July 29, 2024 Public Notice Public Notification Violation without NPDWR Violation Resolved
July 29, 2024 Public Notice Public Notification Violation without NPDWR Violation Resolved
July 13, 2024 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 13, 2024 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 13, 2024 Public Notice Public Notification Violation for NPDWR Violation Resolved
July 1, 2024 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2024 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2024 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2024 Chlorine Monitoring and Reporting (DBP) Resolved
June 28, 2024 Revised Total Coliform Rule Sample Siting Plan Errors (RTCR) Addressed
June 28, 2024 Revised Total Coliform Rule Sample Siting Plan Errors (RTCR) Addressed
June 28, 2024 Revised Total Coliform Rule Sample Siting Plan Errors (RTCR) Addressed
April 1, 2024 Interim Enhanced Surface Water Treatment Rule Monitoring, Turbidity (Enhanced SWTR) Resolved
April 1, 2024 Interim Enhanced Surface Water Treatment Rule Monitoring, Turbidity (Enhanced SWTR) Resolved
April 1, 2024 Interim Enhanced Surface Water Treatment Rule Monitoring, Turbidity (Enhanced SWTR) Resolved
February 1, 2024 E. Coli Monitoring, Source Water (LT2) Resolved
February 1, 2024 E. Coli Monitoring, Source Water (LT2) Resolved
February 1, 2024 E. Coli Monitoring, Source Water (LT2) Resolved
January 1, 2024 Beryllium, Total Monitoring, Regular Resolved
January 1, 2024 Beryllium, Total Monitoring, Regular Resolved
January 1, 2024 Beryllium, Total Monitoring, Regular Resolved
January 1, 2024 Selenium Monitoring, Regular Resolved
January 1, 2024 Selenium Monitoring, Regular Resolved
January 1, 2024 Selenium Monitoring, Regular Resolved
January 1, 2024 Nitrate Monitoring, Regular Resolved
January 1, 2024 Nitrate Monitoring, Regular Resolved
January 1, 2024 Nitrate Monitoring, Regular Resolved
January 1, 2024 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 Dichloromethane Monitoring, Regular Resolved
January 1, 2024 Dichloromethane Monitoring, Regular Resolved
January 1, 2024 Dichloromethane Monitoring, Regular Resolved
January 1, 2024 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2024 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2024 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2024 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2024 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2024 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2024 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2024 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2024 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2024 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2024 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2024 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2024 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2024 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2024 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2024 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2024 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2024 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2024 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2024 E. Coli Monitoring, Source Water (LT2) Resolved
January 1, 2024 E. Coli Monitoring, Source Water (LT2) Resolved
January 1, 2024 E. Coli Monitoring, Source Water (LT2) Resolved
January 1, 2024 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2024 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2024 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2024 Toluene Monitoring, Regular Resolved
January 1, 2024 Toluene Monitoring, Regular Resolved
January 1, 2024 Toluene Monitoring, Regular Resolved
January 1, 2024 Ethylbenzene Monitoring, Regular Resolved
January 1, 2024 Ethylbenzene Monitoring, Regular Resolved
January 1, 2024 Ethylbenzene Monitoring, Regular Resolved
January 1, 2024 Fluoride Monitoring, Regular Resolved
January 1, 2024 Fluoride Monitoring, Regular Resolved
January 1, 2024 Fluoride Monitoring, Regular Resolved
January 1, 2024 Arsenic Monitoring, Regular Resolved
January 1, 2024 Arsenic Monitoring, Regular Resolved
January 1, 2024 Arsenic Monitoring, Regular Resolved
January 1, 2024 Barium Monitoring, Regular Resolved
January 1, 2024 Barium Monitoring, Regular Resolved
January 1, 2024 Barium Monitoring, Regular Resolved
January 1, 2024 Chromium Monitoring, Regular Resolved
January 1, 2024 Chromium Monitoring, Regular Resolved
January 1, 2024 Chromium Monitoring, Regular Resolved
January 1, 2024 Mercury Monitoring, Regular Resolved
January 1, 2024 Mercury Monitoring, Regular Resolved
January 1, 2024 Mercury Monitoring, Regular Resolved
January 1, 2024 Antimony, Total Monitoring, Regular Resolved
January 1, 2024 Antimony, Total Monitoring, Regular Resolved
January 1, 2024 Antimony, Total Monitoring, Regular Resolved
January 1, 2024 Tthm Monitoring and Reporting (DBP) Resolved
January 1, 2024 Tthm Monitoring and Reporting (DBP) Resolved
January 1, 2024 Tthm Monitoring and Reporting (DBP) Resolved
January 1, 2024 Benzene Monitoring, Regular Resolved
January 1, 2024 Benzene Monitoring, Regular Resolved
January 1, 2024 Benzene Monitoring, Regular Resolved
January 1, 2024 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2024 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2024 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2024 Chlorobenzene Monitoring, Regular Resolved
January 1, 2024 Chlorobenzene Monitoring, Regular Resolved
January 1, 2024 Chlorobenzene Monitoring, Regular Resolved
January 1, 2024 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2024 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2024 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2024 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2024 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2024 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2024 Cadmium Monitoring, Regular Resolved
January 1, 2024 Cadmium Monitoring, Regular Resolved
January 1, 2024 Cadmium Monitoring, Regular Resolved
January 1, 2024 Xylenes, Total Monitoring, Regular Resolved
January 1, 2024 Xylenes, Total Monitoring, Regular Resolved
January 1, 2024 Xylenes, Total Monitoring, Regular Resolved
January 1, 2024 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2024 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2024 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2024 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
January 1, 2024 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
January 1, 2024 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
January 1, 2024 Nickel Monitoring, Regular Resolved
January 1, 2024 Nickel Monitoring, Regular Resolved
January 1, 2024 Nickel Monitoring, Regular Resolved
January 1, 2024 Trichloroethylene Monitoring, Regular Resolved
January 1, 2024 Trichloroethylene Monitoring, Regular Resolved
January 1, 2024 Trichloroethylene Monitoring, Regular Resolved
January 1, 2024 Thallium, Total Monitoring, Regular Resolved
January 1, 2024 Thallium, Total Monitoring, Regular Resolved
January 1, 2024 Thallium, Total Monitoring, Regular Resolved
January 1, 2024 Styrene Monitoring, Regular Resolved
January 1, 2024 Styrene Monitoring, Regular Resolved
January 1, 2024 Styrene Monitoring, Regular Resolved
October 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
October 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
October 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
October 1, 2023 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2023 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
October 1, 2023 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Addressed
September 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
September 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
September 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
August 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
August 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
August 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
July 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
July 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
July 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
May 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
May 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
May 1, 2023 E. Coli Monitoring, Source Water (LT2) Resolved
January 1, 2023 Beryllium, Total Monitoring, Regular Resolved
January 1, 2023 Beryllium, Total Monitoring, Regular Resolved
January 1, 2023 Beryllium, Total Monitoring, Regular Resolved
January 1, 2023 Thallium, Total Monitoring, Regular Resolved
January 1, 2023 Thallium, Total Monitoring, Regular Resolved
January 1, 2023 Thallium, Total Monitoring, Regular Resolved
January 1, 2023 Arsenic Monitoring, Regular Resolved
January 1, 2023 Arsenic Monitoring, Regular Resolved
January 1, 2023 Arsenic Monitoring, Regular Resolved
January 1, 2023 Cadmium Monitoring, Regular Resolved
January 1, 2023 Cadmium Monitoring, Regular Resolved
January 1, 2023 Cadmium Monitoring, Regular Resolved
January 1, 2023 Chromium Monitoring, Regular Resolved
January 1, 2023 Chromium Monitoring, Regular Resolved
January 1, 2023 Chromium Monitoring, Regular Resolved
January 1, 2023 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2023 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2023 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2023 Nickel Monitoring, Regular Resolved
January 1, 2023 Nickel Monitoring, Regular Resolved
January 1, 2023 Nickel Monitoring, Regular Resolved
January 1, 2023 Antimony, Total Monitoring, Regular Resolved
January 1, 2023 Antimony, Total Monitoring, Regular Resolved
January 1, 2023 Antimony, Total Monitoring, Regular Resolved
January 1, 2023 Barium Monitoring, Regular Resolved
January 1, 2023 Barium Monitoring, Regular Resolved
January 1, 2023 Barium Monitoring, Regular Resolved
January 1, 2023 Selenium Monitoring, Regular Resolved
January 1, 2023 Selenium Monitoring, Regular Resolved
January 1, 2023 Selenium Monitoring, Regular Resolved
January 1, 2023 Mercury Monitoring, Regular Resolved
January 1, 2023 Mercury Monitoring, Regular Resolved
January 1, 2023 Mercury Monitoring, Regular Resolved
January 1, 2022 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2022 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2022 Lead and Copper Rule Lead Consumer Notice Resolved
December 10, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 10, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
December 10, 2021 Public Notice Public Notification Violation for NPDWR Violation Resolved
179 older violation s (5-10 years ago) · 4 health-based, 175 paperwork , all resolved
Violations 5-10 years ago (179 total)
Period start Relates to Item Measured level Status
January 1, 2021 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2021 Lead and Copper Rule Lead Consumer Notice Resolved
January 1, 2021 Lead and Copper Rule Lead Consumer Notice Resolved
December 1, 2020 Interim Enhanced Surface Water Treatment Rule Monitoring, Turbidity (Enhanced SWTR) Resolved
December 1, 2020 Interim Enhanced Surface Water Treatment Rule Monitoring, Turbidity (Enhanced SWTR) Resolved
December 1, 2020 Interim Enhanced Surface Water Treatment Rule Monitoring, Turbidity (Enhanced SWTR) Resolved
December 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
December 1, 2020 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
December 1, 2020 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
December 1, 2020 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
October 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
October 1, 2020 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2020 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2020 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2020 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
October 1, 2020 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
October 1, 2020 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
October 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
October 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
May 1, 2020 Interim Enhanced Surface Water Treatment Rule Monthly Turbidity Exceed (Enhanced SWTR) Resolved
May 1, 2020 Interim Enhanced Surface Water Treatment Rule Monthly Turbidity Exceed (Enhanced SWTR) Resolved
May 1, 2020 Interim Enhanced Surface Water Treatment Rule Monthly Turbidity Exceed (Enhanced SWTR) Resolved
May 1, 2020 Interim Enhanced Surface Water Treatment Rule Monthly Turbidity Exceed (Enhanced SWTR) Resolved
March 1, 2020 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
March 1, 2020 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
March 1, 2020 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
March 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
March 1, 2020 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
January 1, 2020 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 1,1,2-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2020 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2020 Tetrachloroethylene Monitoring, Regular Resolved
January 1, 2020 Chlorobenzene Monitoring, Regular Resolved
January 1, 2020 Chlorobenzene Monitoring, Regular Resolved
January 1, 2020 Chlorobenzene Monitoring, Regular Resolved
January 1, 2020 Benzene Monitoring, Regular Resolved
January 1, 2020 Benzene Monitoring, Regular Resolved
January 1, 2020 Benzene Monitoring, Regular Resolved
January 1, 2020 Toluene Monitoring, Regular Resolved
January 1, 2020 Toluene Monitoring, Regular Resolved
January 1, 2020 Toluene Monitoring, Regular Resolved
January 1, 2020 Ethylbenzene Monitoring, Regular Resolved
January 1, 2020 Ethylbenzene Monitoring, Regular Resolved
January 1, 2020 Ethylbenzene Monitoring, Regular Resolved
January 1, 2020 Styrene Monitoring, Regular Resolved
January 1, 2020 Styrene Monitoring, Regular Resolved
January 1, 2020 Styrene Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloropropane Monitoring, Regular Resolved
January 1, 2020 Fluoride Monitoring, Regular Resolved
January 1, 2020 Fluoride Monitoring, Regular Resolved
January 1, 2020 Fluoride Monitoring, Regular Resolved
January 1, 2020 Dichloromethane Monitoring, Regular Resolved
January 1, 2020 Dichloromethane Monitoring, Regular Resolved
January 1, 2020 Dichloromethane Monitoring, Regular Resolved
January 1, 2020 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 P-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2020 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2020 Chromium Monitoring, Regular Resolved
January 1, 2020 Chromium Monitoring, Regular Resolved
January 1, 2020 Chromium Monitoring, Regular Resolved
January 1, 2020 Antimony, Total Monitoring, Regular Resolved
January 1, 2020 Antimony, Total Monitoring, Regular Resolved
January 1, 2020 Antimony, Total Monitoring, Regular Resolved
January 1, 2020 Beryllium, Total Monitoring, Regular Resolved
January 1, 2020 Beryllium, Total Monitoring, Regular Resolved
January 1, 2020 Beryllium, Total Monitoring, Regular Resolved
January 1, 2020 Thallium, Total Monitoring, Regular Resolved
January 1, 2020 Thallium, Total Monitoring, Regular Resolved
January 1, 2020 Thallium, Total Monitoring, Regular Resolved
January 1, 2020 Nitrate Monitoring, Regular Resolved
January 1, 2020 Nitrate Monitoring, Regular Resolved
January 1, 2020 Nitrate Monitoring, Regular Resolved
January 1, 2020 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 Cis-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 Xylenes, Total Monitoring, Regular Resolved
January 1, 2020 Xylenes, Total Monitoring, Regular Resolved
January 1, 2020 Xylenes, Total Monitoring, Regular Resolved
January 1, 2020 Tthm Monitoring and Reporting (DBP) Resolved
January 1, 2020 Tthm Monitoring and Reporting (DBP) Resolved
January 1, 2020 Tthm Monitoring and Reporting (DBP) Resolved
January 1, 2020 Vinyl Chloride Monitoring, Regular Resolved
January 1, 2020 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 1,1-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 Trans-1,2-Dichloroethylene Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2020 1,2-Dichloroethane Monitoring, Regular Resolved
January 1, 2020 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 1,1,1-Trichloroethane Monitoring, Regular Resolved
January 1, 2020 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2020 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2020 Carbon Tetrachloride Monitoring, Regular Resolved
January 1, 2020 Nickel Monitoring, Regular Resolved
January 1, 2020 Nickel Monitoring, Regular Resolved
January 1, 2020 Nickel Monitoring, Regular Resolved
January 1, 2020 Arsenic Monitoring, Regular Resolved
January 1, 2020 Arsenic Monitoring, Regular Resolved
January 1, 2020 Arsenic Monitoring, Regular Resolved
January 1, 2020 Mercury Monitoring, Regular Resolved
January 1, 2020 Mercury Monitoring, Regular Resolved
January 1, 2020 Mercury Monitoring, Regular Resolved
January 1, 2020 Selenium Monitoring, Regular Resolved
January 1, 2020 Selenium Monitoring, Regular Resolved
January 1, 2020 Selenium Monitoring, Regular Resolved
January 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2020 Chlorine Monitoring and Reporting (DBP) Resolved
January 1, 2020 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2020 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2020 1,2,4-Trichlorobenzene Monitoring, Regular Resolved
January 1, 2020 Trichloroethylene Monitoring, Regular Resolved
January 1, 2020 Trichloroethylene Monitoring, Regular Resolved
January 1, 2020 Trichloroethylene Monitoring, Regular Resolved
January 1, 2020 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
January 1, 2020 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
January 1, 2020 Total Haloacetic Acids (Haa5) Monitoring and Reporting (DBP) Resolved
January 1, 2020 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 O-Dichlorobenzene Monitoring, Regular Resolved
January 1, 2020 Cadmium Monitoring, Regular Resolved
January 1, 2020 Cadmium Monitoring, Regular Resolved
January 1, 2020 Cadmium Monitoring, Regular Resolved
January 1, 2020 Barium Monitoring, Regular Resolved
January 1, 2020 Barium Monitoring, Regular Resolved
January 1, 2020 Barium Monitoring, Regular Resolved
December 1, 2019 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
December 1, 2019 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
December 1, 2019 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
December 1, 2019 Interim Enhanced Surface Water Treatment Rule Monitoring, Turbidity (Enhanced SWTR) Resolved
December 1, 2019 Interim Enhanced Surface Water Treatment Rule Monitoring, Turbidity (Enhanced SWTR) Resolved
December 1, 2019 Interim Enhanced Surface Water Treatment Rule Monitoring, Turbidity (Enhanced SWTR) Resolved
October 1, 2019 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2019 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
October 1, 2019 Lead and Copper Rule Follow-up Or Routine LCR Tap M/R Resolved
September 1, 2019 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
September 1, 2019 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
September 1, 2019 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
September 1, 2019 Interim Enhanced Surface Water Treatment Rule Monitoring, Turbidity (Enhanced SWTR) Resolved
September 1, 2019 Interim Enhanced Surface Water Treatment Rule Monitoring, Turbidity (Enhanced SWTR) Resolved
September 1, 2019 Interim Enhanced Surface Water Treatment Rule Monitoring, Turbidity (Enhanced SWTR) Resolved
July 1, 2019 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
July 1, 2019 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
July 1, 2019 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
July 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2019 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2019 Chlorine Monitoring and Reporting (DBP) Resolved
September 1, 2017 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
September 1, 2017 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
September 1, 2017 Surface Water Treatment Rule Monitoring of Treatment (SWTR-Filter) Resolved
September 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
September 1, 2017 Revised Total Coliform Rule Monitoring, Routine (RTCR) Resolved
July 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
July 1, 2017 Chlorine Monitoring and Reporting (DBP) Resolved
October 27, 2016 Stage 2 Disinfectants and Disinfection Byproducts Rule Failure Submit IDSE/Subpart V Plan Rpt Resolved
October 27, 2016 Stage 2 Disinfectants and Disinfection Byproducts Rule Failure Submit IDSE/Subpart V Plan Rpt Resolved
October 27, 2016 Stage 2 Disinfectants and Disinfection Byproducts Rule Failure Submit IDSE/Subpart V Plan Rpt Resolved
October 27, 2016 Stage 2 Disinfectants and Disinfection Byproducts Rule Failure Submit IDSE/Subpart V Plan Rpt Resolved

Data from EPA SDWIS (violation records) , last refreshed May 24, 2026.

Where to see every contaminant this utility tested for

EPA's bulk SDWIS dataset gives MyTapWater.us per-system measured values for lead and copper, plus violation records for everything else. To see every regulated contaminant this utility tested for in the past year (TTHMs, HAA5, nitrate, arsenic, fluoride, chromium, etc.) with measured values, read the utility's Consumer Confidence Report (CCR).

Every community water system is required by EPA to publish a CCR annually, by July 1, listing every contaminant they sampled, the measured value, the federal limit, and any health-based exceedances. Most utilities post the report online; some mail it with your bill.

How to find MONARCH MOUNTAIN LODGE's CCR:

Contact this utility

Public administrative contact information for this water system, as filed with the EPA. Use this to ask about your service line, request your home's lead status, or report a water quality issue.

Administrator
RUFFINO, ROBIN Z
Phone
713-385-4767
Email
tammy@monarchmountainlodge.com
Mailing address
1773 WESTBOROUGH DR STE 500
KATY, TX 77449

Where this page's data comes from

Bundle released 2026-Q2, regenerated May 24, 2026. Each section above also shows its own source date so you can tell at a glance how fresh that part of the page is.

Every value on this page is cross-verified before publication; read our methodology for the verification steps and corrections process.